Exam 17: Acquiring and Implementing Accounting Information Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which role in the AIS Development/Acquisition process requires the accountant to be equally adept at dealing with people, accounting, and technology?

(Multiple Choice)
4.9/5
(45)

Outputs of the systems analysis phase of development typically would include all of the following except:

(Multiple Choice)
4.9/5
(35)

Systems implementation is triggered by:

(Multiple Choice)
4.7/5
(31)

As agents of management and the board of directors, ______________________________ ensure that the acquisition team has followed the organization's standard procedures for systems acquisition and that the process has been efficient and effective.

(Short Answer)
4.8/5
(40)

With the ______________________________ approach to systems implementation, the new system either is implemented one subsystem at a time or is introduced into one organizational unit at a time.

(Short Answer)
5.0/5
(35)

The ______________________________ is an examination of a working system, conducted soon after the system's implementation.

(Short Answer)
4.9/5
(37)

The cost of computer hardware to be purchased for a new system is an example of a(n) ____ cost for that system.

(Multiple Choice)
4.9/5
(40)

The user, the programmer, and another member of the programming team do a walkthrough of the module specifications and the test plan to determine that the test plan is adequate; then the programmer codes the program.

(True/False)
4.8/5
(33)

An important segment of the outsourcing market is the application service provider (ASP), which hosts, manages, and provides access to hardware and software over the Internet to multiple users.

(True/False)
4.9/5
(33)

Software as a Service (SaaS) may include:

(Multiple Choice)
4.7/5
(39)

In the ______________________________ approach to systems implementation, both the new and old systems operate together for a period of time.

(Short Answer)
4.8/5
(38)

Perfective maintenance is performed to fix errors.

(True/False)
4.9/5
(37)

Making program changes, correcting errors in the programs, and adding enhancements to the programs is called systems ______________________________.

(Short Answer)
4.9/5
(37)

The removal of program errors is called debugging.

(True/False)
4.9/5
(41)

Structured systems analysis is a set of procedures conducted to generate the specifications for a new (or modified) information system or subsystem.

(True/False)
4.8/5
(44)

The ____ runs a subset of the system in the actual production environment.

(Multiple Choice)
4.9/5
(29)

The ______________________________ documents the system design and summarizes the implementation, training, and test plans.

(Short Answer)
4.9/5
(43)

Which of the following statements related to implementation approaches is true?

(Multiple Choice)
4.9/5
(38)

Briefly discuss application service providers (ASP) and Software as a Service (SaaS).

(Essay)
4.8/5
(34)

Which of the following is not specified in the approved configuration plan?

(Multiple Choice)
4.9/5
(37)
Showing 61 - 80 of 206
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)