Exam 10: Building an Organization Capable of Good Strategy Execution

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

List and describe each phase in the systems development life cycle.

(Essay)
4.9/5
(38)

What is the overall process for developing information systems from planning and analysis through implementation and maintenance?

(Multiple Choice)
4.8/5
(36)

Which of the following is a fundamental of the RAD methodology?

(Multiple Choice)
4.8/5
(39)

The _________ phase involves placing the system into production so users can begin to perform actual business operations with the system.

(Short Answer)
4.9/5
(38)

The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components.

(Short Answer)
4.8/5
(32)

Project ____________ is a formal, approved document that manages and controls project execution.

(Short Answer)
4.9/5
(34)

Which of the following is the most likely why companies outsource?

(Multiple Choice)
4.8/5
(36)

What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

(Multiple Choice)
4.8/5
(35)

Which of the following is a characteristic of a successful project?

(Multiple Choice)
5.0/5
(41)

An important aspect of a project management communications plan is to provide a method for continually obtaining and monitoring feedback from and for all ______________.

(Short Answer)
4.9/5
(34)

A project charter is a document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.

(True/False)
4.8/5
(43)

What are project deliverables?

(Multiple Choice)
4.9/5
(38)

What is the most important part of the project plan?

(Multiple Choice)
4.9/5
(33)

Contract length, competitive edge, ____________, and scope definition are the four primary challenges for outsourcing.

(Short Answer)
4.8/5
(41)

Which activity is performed during the planning phase?

(Multiple Choice)
4.8/5
(26)

Compare the waterfall methodology and the agile methodology.

(Essay)
4.8/5
(34)

The SDLC is different than the waterfall and agile methodologies not in terms of the type of work that is done, but rather who is control and does most of the design work.

(True/False)
4.9/5
(39)

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

(Multiple Choice)
4.9/5
(41)

Describe the benefits and challenges of outsourcing.

(Essay)
4.7/5
(35)

All of the following are challenges of outsourcing, except:

(Multiple Choice)
4.8/5
(42)
Showing 41 - 60 of 147
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)