Which of the following is a type of testing for information systems where developers use the same input and compare the new system's output to the output generated by the system it is replacing?

(Multiple Choice)
4.7/5
(40)

The person who leads a requirements analysis needs to have a solid background in business management and information systems.

(True/False)
4.9/5
(32)

A phased implementation is an expensive process that launches a new system while the old one is still running.

(True/False)
4.8/5
(34)

Which of the following is an advantage of customizing a packaged solution?

(Multiple Choice)
4.8/5
(27)

________ is a process in which stakeholders identify the features that a project will need and then prioritize them as mandatory, preferred, or nonessential.

(Multiple Choice)
4.8/5
(43)

Jonathan has joined a new software company in Manhattan and has been assigned the task of developing an internal communications system. He begins the task by assessing how the system will help in efficiently coordinating the projects that the company handles and in determining the feasibility of the system. In the given scenario, Jonathan is in the ________ step of the systems development life cycle.

(Multiple Choice)
4.7/5
(32)

What is rapid application development? Explain.

(Essay)
4.8/5
(41)

Which of the following features is most likely an example of the usability requirements included in an RDD?

(Multiple Choice)
4.9/5
(35)

Mike, a research analyst, is in the analysis phase of a project, the goal of which is the development of smile shutter technology in cameras. Mike first identifies and analyzes the integral elements that need to be included in the technology such as red eye removal, blink detection, and face identification and then prioritizes them as mandatory, preferred, or nonessential. Which of the following processes is being illustrated in the given scenario?

(Multiple Choice)
4.8/5
(36)

Which of the following functions does a project- and issue-tracking software perform?

(Multiple Choice)
4.8/5
(34)

A use case diagram is used to indicate how ________.

(Multiple Choice)
4.8/5
(38)

Which of the following will take place in a parallel implementation of an information system?

(Multiple Choice)
4.9/5
(32)

What is a request for information (RFI)invitation? How is it related to a request for proposal (RFP)?

(Essay)
4.8/5
(39)

A ________ switches off the old system and launches all the modules of the new one on a single, very hectic go-live date, sometimes called the "big bang."

(Multiple Choice)
4.9/5
(27)

Independent testers are critical in testing information systems mainly because ________.

(Multiple Choice)
4.8/5
(32)

Which of the following is an example of a systems integrator?

(Multiple Choice)
4.8/5
(38)

An early form of business process management (BPM)that was developed as a means to make sweeping changes to eliminate all processes that did not add value was known as ________.

(Multiple Choice)
4.7/5
(31)

Which of the following do all types of information system tests mimic?

(Multiple Choice)
4.8/5
(38)

The ________ phase is a technical blueprint for a whole system which captures all aspects of how the system's components will function together to accomplish goals, using descriptions, diagrams and models.

(Multiple Choice)
4.8/5
(35)

End-users with disabilities should be considered in the design phase of the SDLC.

(True/False)
4.7/5
(37)