Exam 9: Optimization and Simulation Modeling
Exam 1: Operations and Supply Chain Strategy74 Questions
Exam 2: Quality Management75 Questions
Exam 3: New Product Development75 Questions
Exam 4: Process Design and Analysis75 Questions
Exam 5: Forecasting75 Questions
Exam 6: Independent Demand Inventory75 Questions
Exam 7: Dependent Demand Inventory74 Questions
Exam 8: Project Management75 Questions
Exam 9: Optimization and Simulation Modeling75 Questions
Exam 10: Capacity Planning75 Questions
Exam 11: Quality Improvement Methods75 Questions
Exam 12: Lean Enterprise75 Questions
Exam 13: Technology and Integrated Supply Management75 Questions
Exam 14: Global Supply Chain and Service Integration75 Questions
Select questions type
Why are simulation models used in decision making?
Free
(Essay)
4.8/5
(43)
Correct Answer:
Testing proposed new operating procedures in an actual operation can be expensive,complicated,and risky to quality,employees,and equipment.
To simulate the group size of groups of people attending a movie screening,the following translator function is used: Group size 1 = 0 to less than 0.21
Group size 2 = 0.21 to less than 0.65
Group size 3 = 0.65 to less than 0.84
Group size 4 = 0.84 to less than 0.95
Group size of 5 or more = 0.95 to less than 1
What is the simulated group size if the random number 0.59 is generated?
Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
B
Once a region is identified in an LP problem that satisfies all conditions,where will the optimum solution be found with relation to the feasible region?
Free
(Multiple Choice)
4.9/5
(26)
Correct Answer:
D
Three stores are supplied from three distribution centers.Shipping costs,store demand,and distribution center (DC)capacity are shown in the following table.


(Essay)
4.9/5
(34)
Sam's Sawmill makes two products.One product is a wood bench (B)and the other product is a wood stool (S).Sam has a sawmill,so having the right material on hand is never a problem.However,production is limited.Sam's brother Chris is the carpenter,and he cannot work more than 240 hours a month.It takes Chris 4 hours to make a bench and 3 hours to make a stool.Sam had a limited budget,so he installed a small paint booth for staining the products.Sam does the painting,but he only has 100 hours a month available.It takes Sam 2 hours to paint a bench and 1 hour to paint a stool.Sam makes $7 for every bench and $5 profit for every stool.
Identify the corner points of the feasible region.
(Essay)
4.8/5
(29)
If the marketing department would like at least 100 white blenders to be produced,the sign for this constraint would be:
(Multiple Choice)
4.9/5
(38)
Which of the following means arriving at a maximum or minimum point of a mathematical function?
(Multiple Choice)
4.7/5
(34)
Identify three disadvantages to building simulation models in spreadsheets.
(Essay)
4.9/5
(34)
Linear programming is commonly used to solve all the following types of problems except
(Multiple Choice)
4.9/5
(36)
In addition to management decision-making games and model validation,discrete-event simulation can be used for what other purpose?
(Multiple Choice)
4.7/5
(37)
The objective function of a linear program provides the criterion by which all decisions should be evaluated.
(True/False)
4.9/5
(31)
When the state of a system needs to be known at specific times,numerical simulation is a viable option for a decision maker.
(True/False)
4.8/5
(34)
The graphical solution to a linear programming problem can be used when there are only two decision variables.
(True/False)
4.9/5
(40)
Which of the following is not considered to be a component of linear programming?
(Multiple Choice)
4.8/5
(40)
If a transportation problem has suppliers at four locations and customers at six locations,how many decision variables are required to solve the transportation problem?
(Essay)
4.8/5
(41)
When using Microsoft Excel to solve an LP problem,the software package provides an answer report and what other report?
(Multiple Choice)
4.8/5
(31)
If a company is trying to maximize profit while selling two products,Bigpods with $10 profit and Smallpods with $7 profit,and if 100 assembly hours are split equally between the two products and one hour assembly is required for each pod,what is the maximum profit?
(Multiple Choice)
4.8/5
(31)
Which term describes the additional amount a company will make if one more unit of a constrained resource is added?
(Multiple Choice)
4.8/5
(34)
Showing 1 - 20 of 75
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)