Which of the following industries would probably not utilize service resource planning?

Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
Verified

E

Inventory records include transactions both from manufacturing within an organization and from purchasing items from external suppliers.

Free
(True/False)
4.9/5
(32)
Correct Answer:
Verified

True

The document that details the quantity of end items to be produced within a specified period of time is

Free
(Multiple Choice)
4.9/5
(44)
Correct Answer:
Verified

B

L4L lot sizes minimize inventory levels by ordering only what is needed.

(True/False)
4.7/5
(40)

Why are lot size rules important?

(Multiple Choice)
4.7/5
(36)

Describe three factors that contribute to MRP success.

(Essay)
4.8/5
(31)

MRP planning factors are managerial choices.

(True/False)
4.8/5
(33)

Determine the quantity of part D required to build each item X.

(Essay)
5.0/5
(42)

What factors go into determining the lot for lot size to arrive in a given period?

(Essay)
4.8/5
(39)

Describe the differences in the evolution of MRP,MRP II,and ERP.

(Essay)
4.8/5
(31)

An MRP system creates a master schedule.

(True/False)
4.9/5
(31)

L4L rules are most appropriate for what type of items?

(Multiple Choice)
4.9/5
(38)

Which of the following items enhances the effectiveness of an MRP system?

(Multiple Choice)
4.9/5
(33)

In an MRP system,the records developed assume that sufficient capacity is available for the required production.

(True/False)
4.9/5
(41)

Which of the following is not critical for an MRP system to work?

(Multiple Choice)
4.9/5
(36)

Training is a key component of making an MRP system work.

(True/False)
4.7/5
(42)

Every MRP record includes three planning factors: lot size,lead time,and material cost.

(True/False)
4.9/5
(42)

Engineering and process design information is critical to preparing which MRP input?

(Multiple Choice)
4.8/5
(30)

Which phrase refers to a situation in MRP planning where a change in one part level ripples down to affect lower-level parts?

(Multiple Choice)
4.8/5
(53)

For items that are manufactured within a company,the lead time must take into account all the following factors,except

(Multiple Choice)
4.8/5
(33)