Exam 6: Process-Flow Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Flowcharting requires Microsoft Visio or similar flowcharting software.

Free
(True/False)
4.9/5
(36)
Correct Answer:
Verified

False

Throughput time is

Free
(Multiple Choice)
4.7/5
(37)
Correct Answer:
Verified

C

Which of the following statements is/are correct? (1)It is important for flowchart analysis to have a specific improvement goal in mind (e)g.,reduce throughput time). (2)It is important for flowchart analysis to only use the common flowchart symbols When creating the flowchart to avoid any confusion.

Free
(Multiple Choice)
4.9/5
(30)
Correct Answer:
Verified

A

If there are multiple resources that process each transaction,then the process capacity is the sum of all the individual capacities of the resources.

(True/False)
4.8/5
(40)

It takes 1 minute to remove a burger from the cooler.The burger is cooked for 2 minutes and requires constant monitoring (the worker cannot do something else during cooking).Cooked burgers are assembled into sandwiches with buns,lettuce,and tomato slices.This step takes 45 seconds per sandwich.Finally,packaging the sandwich takes about 10 seconds.What is the bottleneck in the process? Why?

(Essay)
4.9/5
(36)

Process elements that might be changed when improving a process include

(Multiple Choice)
4.8/5
(38)

A diamond symbol in a flowchart indicates

(Multiple Choice)
4.8/5
(32)

A bank has an average of 10 customers per hour arriving into the system,and it takes an average of 30 minutes for the clerk to complete a transaction with a customer.What is the average length of the queue in the bank?

(Multiple Choice)
4.8/5
(34)

A machine center can produce 175 units per day at 100% utilization.Demand is 75 units per day,and suppliers are capable of delivering raw materials to support production of 125 units per day.If demand doubles,the flow rate will be

(Multiple Choice)
4.8/5
(37)

Fit the following question to the correct category: Are all operational steps or activities necessary?

(Multiple Choice)
4.9/5
(46)

A process will generally have at least one bottleneck.

(True/False)
4.8/5
(36)

Provide two examples for each of the following categories of good questions to ask when conducting process flow analysis: a.Flow b.Time c.Quantity d.Quality e.Cost

(Essay)
4.9/5
(35)

Symbols used within a typical flowchart include all of the following EXCEPT

(Multiple Choice)
4.9/5
(37)

Process redesign tends to be cross-functional in nature and requires a complete overhaul of work methods,flows,and information systems.

(True/False)
4.9/5
(42)

Consider the following two statements concerning business process reengineering (BPR): (1)BPR results are greatest when each function redesigns its own core processes. (2)BPR efforts should be focused on the critical processes required to meet Customers' needs.

(Multiple Choice)
4.8/5
(32)

Which of the following statements regarding business process reengineering is NOT correct?

(Multiple Choice)
4.9/5
(38)

Analysis of the flow of information

(Multiple Choice)
4.9/5
(28)

Which of the following would NOT be changed due to process flow analysis?

(Multiple Choice)
4.9/5
(39)

The capacity of a process is determined by

(Multiple Choice)
4.8/5
(37)

A service blueprint

(Multiple Choice)
4.7/5
(36)