Exam 9: Quality Control and Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements is true?

Free
(Multiple Choice)
4.9/5
(43)
Correct Answer:
Verified

C

The quality tool that shows the relationship between two variables is a histogram.

Free
(True/False)
4.8/5
(45)
Correct Answer:
Verified

False

Which of the following statements about process capability is accurate?

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

D

A machining process is capable of producing a component with an average specification of 5 inches and a process standard deviation of 0.1 inch.Supposing the customer accepts the component as long as it falls between 4.8 inches and 5.2 inches,then the process capability is

(Multiple Choice)
4.9/5
(37)

Which of the following makes the most sense,given today's view of quality control?

(Multiple Choice)
4.7/5
(38)

A process for filling liquid laundry detergent bottles monitors the volume in each bottle.The operations manager has taken 5 samples with 4 observations (bottles)in each sample to determine if the variation in volume is reasonable.The measurement unit is fluid ounces.Calculate the center line for a process control chart that indicates whether the variation within samples is reasonable (in a state of control). A process for filling liquid laundry detergent bottles monitors the volume in each bottle.The operations manager has taken 5 samples with 4 observations (bottles)in each sample to determine if the variation in volume is reasonable.The measurement unit is fluid ounces.Calculate the center line for a process control chart that indicates whether the variation within samples is reasonable (in a state of control).

(Multiple Choice)
4.8/5
(43)

Generally,two types of data may be collected from sampling at an inspection point.These two types of data are

(Multiple Choice)
4.8/5
(37)

The chair of the Quality Department at Motorola University wants to construct a p-chart for determining whether the four faculty members teaching the course are in a state of control concerning the number of students who fail in the course.Accordingly,the chair sampled 500 final grades from last year for each instructor,and computed the number of failures per instructor as 13,11,0,and 16 respectively.Compute the upper and lower standard control limits for this chart.

(Multiple Choice)
4.9/5
(36)

Regarding the design of a quality control system,which of the following statements is correct?

(Multiple Choice)
4.8/5
(43)

Attribute control occurs when the product characteristic is measured on a continuous scale.

(True/False)
4.9/5
(38)

Which of the following techniques are used for continuous improvement?

(Multiple Choice)
4.9/5
(39)

Suppose that you have taken 30 samples of 200 units each and calculated the proportion defective as p = .075.What is the upper control limit for a p-chart?

(Multiple Choice)
4.8/5
(38)

Which of the following statements is NOT correct?

(Multiple Choice)
4.7/5
(36)

List and explain the five steps of the DMAIC process.

(Essay)
4.8/5
(37)

Lean projects are usually simpler than six sigma projects.

(True/False)
4.7/5
(43)

In process capability analysis,the standard deviation ( σ\sigma )refers to the standard deviation of sample measures.

(True/False)
4.9/5
(36)

Which of the following statements about six sigma is NOT correct?

(Multiple Choice)
4.8/5
(36)

A cause-and-effect diagram

(Multiple Choice)
4.8/5
(40)

__________ are ideal for monitoring continuous data.

(Multiple Choice)
4.9/5
(45)

Six sigma projects are typically managed by workers certified as black belts.

(True/False)
4.8/5
(36)
Showing 1 - 20 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)