Exam 12: Scheduling Operations
Exam 1: The Operations Function41 Questions
Exam 2: Operations and Supply Chain Strategy48 Questions
Exam 3: Product Design44 Questions
Exam 4: Process Selection52 Questions
Exam 5: Service Delivery System Design53 Questions
Exam 6: Process-Flow Analysis44 Questions
Exam 7: Lean Thinking and Lean Systems52 Questions
Exam 8: Managing Quality50 Questions
Exam 9: Quality Control and Improvement50 Questions
Exam 10: Forecasting54 Questions
Exam 11: Capacity Planning50 Questions
Exam 12: Scheduling Operations42 Questions
Exam 13: Project Planning and Scheduling39 Questions
Exam 14: Independent Demand Inventory60 Questions
Exam 15: Materials Requirements Planning and ERP44 Questions
Exam 16: Supply Chain Management47 Questions
Exam 17: Sourcing45 Questions
Exam 18: Global Logistics42 Questions
Select questions type
The overriding problem in batch scheduling is
Free
(Multiple Choice)
4.7/5
(42)
Correct Answer:
C
Which of the following statements concerning scheduling is INCORRECT?
Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
B
Which of the following statements is NOT true about the theory of constraints (TOC)?
(Multiple Choice)
4.8/5
(34)
Which of the following is a tactic for reducing demand pressure on a process bottleneck?
(Multiple Choice)
4.8/5
(32)
A bottleneck should never be blocked or starved.Non-bottlenecks must function to keep the bottleneck at full utilization.
(True/False)
4.9/5
(41)
A manufacturing company could increase the output rate of the bottleneck by running larger batches at the bottleneck (assuming another bottleneck in the plant does not interfere).
(True/False)
4.9/5
(34)
Which of the following is a performance measure for a Gantt chart?
(Multiple Choice)
4.9/5
(36)
The preemptive rule in a manufacturing setting is based on remaining time until the due date and the remaining processing time.
(True/False)
4.8/5
(38)
Under the theory of constraints,throughput is defined as the difference between the sales and the operating expenses of a plant.
(True/False)
4.8/5
(35)
If the critical ratio of a job is greater than 1,the job is late.
(True/False)
4.9/5
(32)
Which of the following is NOT determined by Gantt charting?
(Multiple Choice)
4.8/5
(26)
First come,first served is widely used in both service and manufacturing firms.
(True/False)
4.9/5
(29)
What are the steps that could be taken at a bottleneck resource to increase its capacity?
(Essay)
4.9/5
(33)
Finite capacity scheduling can be used to identify the bottleneck in a given process.
(True/False)
4.8/5
(28)
Scheduling systems answer all the following questions EXCEPT
(Multiple Choice)
4.7/5
(33)