Which of the following describes a kaizen event?

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

C

With regards to suppliers,lean systems typically require

Free
(Multiple Choice)
4.9/5
(44)
Correct Answer:
Verified

D

According to the lean philosophy,a stable master production schedule is desirable to reduce the work-in-process inventories.

Free
(True/False)
4.9/5
(33)
Correct Answer:
Verified

True

Given the following information pertaining to item AX143,determine the appropriate number of kanban containers that should be used to support production. Demand rate = 500 units/week Time for container to complete circuit = 2 weeks Safety stock = 30 percent Size of container = 5 units

(Multiple Choice)
4.8/5
(39)

The time it takes a container to complete an entire circuit consists of

(Multiple Choice)
4.9/5
(44)

The Japanese term for waste is "gemba."

(True/False)
4.9/5
(36)

Which of the following is NOT generally an element of a lean system?

(Multiple Choice)
4.8/5
(34)

Which of the following would NOT be an example of waste in a retail grocery store?

(Multiple Choice)
4.9/5
(43)

A work center uses kanban containers that hold 200 parts.To produce enough parts to fill a container,60 minutes of setup plus run time are needed.Moving the container to the next workstation,waiting time,processing time at the next work station,and return of the empty container take 120 minutes.There is an overall demand rate of 10 units per minute.Calculate the number of containers needed for this process.

(Multiple Choice)
4.9/5
(40)

One of the main objectives of a lean system is

(Multiple Choice)
4.7/5
(36)

The effect of a lean system on employees can best be described as

(Multiple Choice)
4.9/5
(36)

Which of the following is true about kanban systems?

(Multiple Choice)
4.9/5
(45)

The ideal lot size for a lean system is

(Multiple Choice)
4.7/5
(32)

How is the 5 Whys technique used in a lean system?

(Essay)
4.9/5
(44)

Kaizen events typically take from one to two months.

(True/False)
4.9/5
(43)

If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a kanban container holds 20 parts,how many containers are required?

(Multiple Choice)
4.8/5
(31)

Lean is an example of a pull system while lean thinking is an example of a push system.

(True/False)
4.8/5
(39)

The ideal setup time for a lean system is

(Multiple Choice)
4.7/5
(39)

Which of the following is NOT a lean tenet?

(Multiple Choice)
4.8/5
(39)

Supplier management in a lean system

(Multiple Choice)
4.8/5
(36)