One purpose of quality control is to reduce the costs associated with producing and delivering poor quality goods and services.

(True/False)
4.8/5
(39)

Random samples of four items are selected from a manufacturing process at regular intervals and a certain quality characteristic is measured. After 25 samples,ΣX = 15,350 and ΣR = 411.4. To construct a range chart,what is the LCL for the range?

(Multiple Choice)
4.9/5
(31)

The Quality Assurance Department selected a sample of 12 printed circuit boards and tested them. The number of defects in each circuit board was 3,3,0,5,1,1,5,6,6,2,0,and 1. What kind of control chart should be constructed to monitor the process?

(Multiple Choice)
4.9/5
(33)

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results: A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results:   What is the upper control limit (UCL)for the mean? What is the upper control limit (UCL)for the mean?

(Multiple Choice)
4.9/5
(30)

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results: A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results:   What is the value of the lower control factor of the range? What is the value of the lower control factor of the range?

(Multiple Choice)
4.9/5
(26)

A quality control chart is used to monitor the customer wait time at a local call center. Sample means of five times are averaged and plotted over time. The last five sample means show a trend of increasing sample means. The process is ________.

(Multiple Choice)
4.8/5
(31)

A fishbone diagram is used to determine if a process is out of control.

(True/False)
4.7/5
(31)

Mean charts are designed to determine whether a process is in or out of control based on sample means.

(True/False)
4.7/5
(32)

Random samples of four items are selected from a manufacturing process at regular intervals and a certain quality characteristic is measured. After 25 samples,ΣX = 15,350 and ΣR = 411.4. To construct a range chart,what is the UCL for the range?

(Multiple Choice)
4.8/5
(36)

Control charts are used to determine if a process is ________.

(Multiple Choice)
4.9/5
(40)

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results: A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results:   What is the mean range? What is the mean range?

(Multiple Choice)
4.8/5
(36)

In acceptance sampling,the risk of accepting a poor-quality lot is known as ________.

(Multiple Choice)
4.8/5
(30)

Random samples of four items are selected from a manufacturing process at regular intervals,and a certain quality characteristic is measured. After 25 samples,ΣX = 15,350 and ΣR = 411.4. To construct a mean chart,what is the value for the centerline?

(Multiple Choice)
4.8/5
(32)

The purpose of a statistical quality control chart is to identify when assignable causes of variation have entered the production system so that the cause may be identified and corrected.

(True/False)
4.9/5
(37)

Which of the following statements about causes of variation are true? I. Assignable variation is random in nature and cannot be eliminated or reduced. II. Chance variation cannot be completely eliminated unless there are significant methods,techniques,or equipment used in the process. III. Chance variation usually cannot be corrected,while assignable variation is correctable.

(Multiple Choice)
4.7/5
(30)

A quality control chart is used to monitor the customer wait time at a local call center. Sample means of five times are averaged and plotted over time. The last 50 sample means are randomly distributed between the upper and lower control limits. The process is ________.

(Multiple Choice)
4.8/5
(29)

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results: A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then,once the machine is running,a sample of six tubes is taken every three hours and weighed with the following results:   What is the range of the samples at 4 pm? What is the range of the samples at 4 pm?

(Multiple Choice)
4.8/5
(38)

In acceptance sampling,there is one unique operating characteristic curve for a specified sampling plan.

(True/False)
4.7/5
(34)

A large restaurant contracts with a local laundry to wash white napkins. The laundry returns the napkins in bundles of 100 napkins. The restaurant randomly samples 10 napkins to make sure that the napkins are clean with no stains or other defects. The restaurant is using a method called ________.

(Multiple Choice)
4.8/5
(38)

Which probability distribution is used to develop a percent defective chart?

(Multiple Choice)
4.9/5
(35)