Exam 14: Jit and Lean Operations
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
Lean systems typically require that suppliers be able to provide large lots at periodic intervals.
(True/False)
4.9/5
(36)
A functioning MRP system is required prior to adopting lean planning and control systems.
(True/False)
4.9/5
(34)
Lean systems often rely on a method of overhead allocation known as:
(Multiple Choice)
4.8/5
(27)
Having a vendor be responsible for managing the restocking of inventory is what is meant by the term:
(Multiple Choice)
4.7/5
(43)
The ultimate goal of lean operations is a system characterized by the smooth, rapid flow of materials.
(True/False)
5.0/5
(37)
Preventive maintenance will eliminate the need to carry supplies of spare parts.
(True/False)
4.7/5
(36)
A production system uses kanban cards to control production and movement of parts. One work center uses an average of 40 pieces per hour of a certain part. Standard containers hold 10 parts. The cycle time for parts containers is about 36 minutes. Management has assigned an efficiency factor of .20 to this work center. How many containers should be used to support this operation?
(Short Answer)
4.9/5
(34)
Showing 81 - 87 of 87
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)