Exam 20: Introduction to Systems Development and Systems Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The ________ method of gathering information helps to determine how a system actually works.

(Multiple Choice)
4.9/5
(31)

Identify the statement below that best describes a Gantt chart.

(Multiple Choice)
4.9/5
(36)

A company that invests in a system in the hopes of improving product or service quality is attempting to use their information system to gain

(Multiple Choice)
4.7/5
(29)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? A B C D Payback 3 5 8 5 NPV \ 67.95 \ 200.96 \ 256.78 \ 669.85 IRR 12.59\% 11.81\% 10.93\% 11.81\%

(Multiple Choice)
4.8/5
(38)

When the information is brief and well defined,which is the best data-gathering approach to use?

(Multiple Choice)
4.8/5
(38)

________ requires that all activities and the precedent and subsequent relationships among them be identified.

(Multiple Choice)
4.8/5
(39)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? Payback 4 5 4.5 3 NPV \ 2,199 \ 201 \ 1,851 \ 510 IRR 20.24\% 11.81\% 19.64\% 12.59\%

(Multiple Choice)
4.7/5
(37)

The system objective concerned that system should process data accurately and completely is known as

(Multiple Choice)
4.9/5
(34)

Describe the four primary objectives of a systems survey conducted during systems analysis.

(Essay)
4.8/5
(39)

A feasibility study should first be performed in the ________ stage of the systems development life cycle.

(Multiple Choice)
4.8/5
(42)

Describe the three commonly used capital budgeting techniques.

(Essay)
4.9/5
(31)

Identify the main reasons why companies change existing systems?

(Essay)
4.8/5
(30)

Discuss the relative advantages and disadvantages of the four different methods for gathering data during a systems survey.

(Essay)
4.8/5
(41)

When is a proposal to conduct a systems analysis prepared?

(Multiple Choice)
4.8/5
(41)

In order to reduce resistance resulting from uncertainty,what guideline should be implemented and followed during the systems development process?

(Multiple Choice)
4.8/5
(41)

Approximately what percentage of software development projects were unsuccessful?

(Multiple Choice)
4.8/5
(35)

The most important and frequently re-analyzed part of a feasibility study is the ________ aspect.

(Multiple Choice)
4.8/5
(38)

PERT is an acronym that stands for

(Multiple Choice)
4.8/5
(29)

Which planning technique does not show the relationships among various activities?

(Multiple Choice)
4.9/5
(39)

All of the elements of the system come together in which step of the systems development life cycle?

(Multiple Choice)
4.9/5
(38)
Showing 101 - 120 of 124
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)