Exam 20: Introduction to Systems Development and Systems Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When seeking to find anonymous answers,the most useful approach is to

(Multiple Choice)
4.7/5
(31)

The ________ method of gathering information helps to determine how a system should work.

(Multiple Choice)
4.8/5
(33)

Which of the following will help organizations to determine whether a system's benefits justify the time,money,and resources required to implement it.

(Multiple Choice)
4.8/5
(36)

Companies usually accept the project with the ________ when using the payback method to determine a project's economic feasibility.

(Multiple Choice)
4.8/5
(26)

Describe the five phases of systems analysis.

(Essay)
4.8/5
(35)

When seeking to describes how a system should work,the most useful approach is to

(Multiple Choice)
4.9/5
(42)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? h Payback 4 5 4.5 3 NPV \ 2,199 \ 201 \ 1,851 \ 510 IRR 20.24\% 11.81\% 19.64\% 12.59\%

(Multiple Choice)
4.9/5
(37)

The ________ describes what a system will consist of,how it will be developed,who will develop it,when it will be developed,how needed resources will be acquired,the status of projects in process,the prioritization of planned projects,and the prioritization criteria.

(Multiple Choice)
4.8/5
(41)

Describe the physical design stage of the systems development life cycle.

(Essay)
4.8/5
(40)

In which phase of the systems development life cycle where the information needed to purchase,develop,or modify a system is gathered?

(Multiple Choice)
4.8/5
(36)

Which method of data gathering is most likely to result in information that represents the personal biases and opinions of the person giving the information?

(Multiple Choice)
4.8/5
(32)

In which tool is a prioritized list of projects contained?

(Multiple Choice)
4.8/5
(37)

A prototype

(Multiple Choice)
4.8/5
(37)

In which phase of the systems development life cycle where analysts decide how to meet user needs,identify and evaluate design alternatives,and develop detailed specifications for what the system is to accomplish and how it is to be controlled?

(Multiple Choice)
4.9/5
(30)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? h Payback 4 5 4.5 3 NPV \ 2,199 \ 201 \ 1,851 \ 510 IRR 20.24\% 11.81\% 19.64\% 12.59\%

(Multiple Choice)
4.8/5
(31)

Who is responsible for ensuring that the new system will meet the needs of users?

(Multiple Choice)
4.9/5
(39)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? A B C D Payback 3 5 8 5 NPV \ 67.95 \ 200.96 \ 256.78 \ 669.85 IRR 12.59\% 11.81\% 10.93\% 11.81\%

(Multiple Choice)
4.8/5
(34)

A network of arrows and nodes representing project activities that require an expenditure of time and resources and the completion of initiation of activities,respectively,is called

(Multiple Choice)
4.7/5
(34)

Which of the following about planning for systems development is false?

(Multiple Choice)
4.8/5
(32)

Which group of individuals listed below can be the most effective in generating employee support and encouraging the development and acceptance of an AIS project?

(Multiple Choice)
4.9/5
(34)
Showing 41 - 60 of 124
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)