Exam 18: Statistical Quality Control
Exam 1: Introduction to Statistics79 Questions
Exam 2: Charts and Graphs75 Questions
Exam 3: Descriptive Statistics63 Questions
Exam 4: Probability72 Questions
Exam 5: Discrete Distributions80 Questions
Exam 6: Continuous Distributions78 Questions
Exam 7: Sampling and Sampling Distributions76 Questions
Exam 8: Statistical Inference: Estimation for Single Populations80 Questions
Exam 9: Statistical Inference: Hypothesis Testing for Single Populations79 Questions
Exam 10: Statistical Inferences About Two Populations70 Questions
Exam 11: Analysis of Variance and Design of Experiments80 Questions
Exam 12: Simple Regression Analysis and Correlation84 Questions
Exam 13: Multiple Regression Analysis80 Questions
Exam 14: Building Multiple Regression Models80 Questions
Exam 15: Time-Series Forecasting and Index Numbers77 Questions
Exam 16: Analysis of Categorical Data76 Questions
Exam 17: Nonparametric Statistics81 Questions
Exam 18: Statistical Quality Control68 Questions
Exam 19: Decision Analysis78 Questions
Select questions type
Nels Neugent,Purchasing Manager at Pacific Medical Center,is designing a p chart to monitor the proportion of defective purchase orders issued at Pacific.He has the proportions defective for 22 samples of purchase orders.Each sample contained 150 purchase orders,and the average proportion defective is 0.08.The lower control limit for Nels's p chart is ___.
Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
C
A graph which plots the proportions of items in noncompliance for multiple samples is called a (n)___.
Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
C
One definition that captures the spirit of most quality efforts in the business world is that quality results when a product delivers what is stipulated for it in its specifications.
Free
(True/False)
4.9/5
(21)
Correct Answer:
True
Nels Neugent,Purchasing Manager at Pacific Medical Center,is designing a c chart to monitor the number of nonconformances per purchase order issued at Pacific.The total number of nonconformances for 30 purchase orders is 45.The centerline for Nels' c chart is ___.
(Multiple Choice)
4.9/5
(31)
Compare various tools that identify,categorize,and solve problems in the quality improvement process,including flowcharts,Pareto analysis,cause-and-effect diagrams,control charts,check sheets,histograms,and scatter charts.
(Essay)
5.0/5
(34)
A graph which plots the number of nonconformances per item for multiple samples is called a (n)___.
(Multiple Choice)
4.9/5
(28)
A plot of the sample ranges over regular time intervals is called a (n)___.
(Multiple Choice)
4.8/5
(36)
The Six Sigma approach essentially calls for the process to approach defect-free status.
(True/False)
4.8/5
(46)
Sarah Soliz,Director of Quality Programs,is designing and R charts for the rod shearing process at Stockton Steel.She has 26 samples of rod length,and each sample included measurements of 5 rods.The mean of the 26 sample means is 112 centimetres,and mean of the 26 ranges is 0.15 centimetres.The lower control limit for her R chart is ___.
(Multiple Choice)
4.8/5
(32)
Sarah Soliz,Director of Quality Programs,is designing and R charts for the rod shearing process at Stockton Steel.She has 26 samples of rod length,and each sample included measurements of 5 rods.The mean of the 26 sample means is 112 centimetres,and mean of the 26 ranges is 0.15 centimetres.The lower control limit for her chart is ___.
(Multiple Choice)
4.8/5
(40)
Quality control can be undertaken in two distinct ways: after-process control and before-process control.
(True/False)
5.0/5
(42)
A schematic representation of all the activities and interactions that occur in a process is called a Pareto chart.
(True/False)
4.7/5
(44)
Jack Joyner,Director of Quality Control at Covington Castings (CC),is designing a c chart to monitor the number of nonconformances per aluminum casting produced at CC.The total number of nonconformances for 26 castings is 91.The centerline for Jack's c chart is ___.
(Multiple Choice)
4.8/5
(25)
An chart is being developed using 25 samples of size 8 each.The average of 25 sample means is 6.20.The average of the 25 ranges is 0.30.The lower control limit is ___.
(Multiple Choice)
4.8/5
(26)
Jack Joyner,Director of Quality Control at Covington Castings (CC),is designing a c chart to monitor the number of nonconformances per aluminum casting produced at CC.The total number of nonconformances for 26 castings is 91.The upper control limit for Jack's c chart is ___.
(Multiple Choice)
4.8/5
(35)
Sarah Soliz,Director of Quality Programs,is designing and R charts for the rod shearing process at Stockton Steel.She has 26 samples of rod length,and each sample included measurements of 5 rods.The mean of the 26 sample means is 112 centimetres,and mean of the 26 ranges is 0.15 centimetres.The centerline for her R chart is ___.
(Multiple Choice)
4.8/5
(35)
Two general types of control charts are (1)control charts for manufactured items and (2)control charts for services.
(True/False)
4.9/5
(35)
An R Chart is to be developed for use in quality control.The average of the ranges is calculated to be 0.60.This was based on several samples of size 7 each.What would the upper control limit be?
(Multiple Choice)
4.8/5
(39)
Two general types of control charts are (1)control charts for measurements and (2)control charts for compliance items.
(True/False)
4.7/5
(44)