Exam 3: Cost Behavior
Exam 1: Introduction to Cost Management157 Questions
Exam 2: Basic Cost Management Concepts201 Questions
Exam 3: Cost Behavior200 Questions
Exam 4: Activity-Based Costing201 Questions
Exam 5: Product and Service Costing: Job-Order System150 Questions
Exam 6: Process Costing188 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products173 Questions
Exam 8: Budgeting for Planning and Control Key200 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach123 Questions
Exam 10: Decentralization: Responsibility Accounting, Performance Evaluation, and Transfer Pricing139 Questions
Exam 11: Strategic Cost Management151 Questions
Exam 12: Activity-Based Management146 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control124 Questions
Exam 14: Quality and Environmental Cost Management202 Questions
Exam 15: Lean Accounting and Productivity Measurement172 Questions
Exam 16: Cost-Volume-Profit Analysis138 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making128 Questions
Exam 18: Pricing and Profitability Analysis164 Questions
Exam 19: Capital Investment126 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints127 Questions
Select questions type
Which of the following is NOT a correct statement concerning cost behavior?
(Multiple Choice)
4.8/5
(32)
__________ and __________ studies may be used in conjunction with the industrial engineering method.
or
(Short Answer)
4.8/5
(39)
The most widely used method to determine cost behavior is managerial judgement.
(True/False)
4.9/5
(39)
A correlation coefficient near 0 means that two variables are __________ .
(Short Answer)
4.9/5
(38)
__________ analysis focuses on how costs react to changes in activity levels.
(Short Answer)
4.7/5
(33)
Figure 3-5 Longberry Corporation manufactures and sells party items. The following representative direct labor hours and production costs are provided for a four-month period:
Refer to Figure 3-5. Using the high-low method, what is the cost formula for estimating costs?


(Multiple Choice)
4.8/5
(40)
Figure 3-1 Sonor Systems undertakes its own machine maintenance. The depreciation on the equipment is $20,000 per year and operating cost is $2 per machine hour. Last year 275,000 machine hours were used to produce 100,000 units.
Refer to Figure 3-1. Compute the total variable machine maintenance cost last year.
(Multiple Choice)
5.0/5
(43)
A manufacturing company pays an assembly line worker $12 per hour. What is the proper classification of this labor cost?
(Multiple Choice)
4.9/5
(41)
Which of the following is NOT a method of determining cost behavior?
(Multiple Choice)
4.7/5
(35)
The cost behavior method that may use time and motion studies to determine the activities and amounts for cost behavior analysis is
(Multiple Choice)
4.8/5
(42)
The following data were obtained from the books of Thomas Company:
Required:
Use a computer or calculator to prepare the following:




(Essay)
4.8/5
(36)
The Knapp Company needs to predict the labor cost in producing small ceramic dolls. The following production information is available:
Wage rates have steadily increased since 2011; however, management expects no
further increases in 2017.
Required:



(Essay)
4.7/5
(40)
Figure 3-8 The following computer printout estimated overhead costs using multiple regression:
During the year the company used 1,000 setup hours and 500 parts.
Refer to Figure 3-8. What is the predicted overhead cost?

(Multiple Choice)
4.9/5
(33)
Figure 3-2 A company usually processes 20,000 orders at a total cost of $300,000. During the year, only 16,000 orders were processed.
Refer to Figure 3-2. What is the cost of resource usage?
(Multiple Choice)
4.8/5
(42)
Which of the following would be an example of a unit-based cost driver?
(Multiple Choice)
4.9/5
(28)
The plant manager requested information to assist in estimating maintenance costs. The following computer printout was generated using the least-squares method:
Required:



(Essay)
4.7/5
(32)
The graph showing the relationship between activity costs and drivers/outputs is called the __________ .
(Short Answer)
4.9/5
(38)
Figure 3-8 The following computer printout estimated overhead costs using multiple regression:
During the year the company used 1,000 setup hours and 500 parts.
Refer to Figure 3-8. The model being measured is

(Multiple Choice)
4.8/5
(35)
Showing 161 - 180 of 200
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)