Exam 19: Master Scheduling and Rough-Cut Capacity Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Consider an MPS record. An MPS shipment amount is always set equal to the absolute value of the amount in the projected available row if that amount is negative.

(True/False)
4.8/5
(31)

Beginning Inventory + MPS Shipment - maximum of (forecast and customer orders)is called ________________________.

(Short Answer)
4.8/5
(33)

Consider the following partial ATP MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 2? Period: 1 2 3 4 5 Forecast: 50 5 40 25 50 Customer Orders: 40 10 20 0 5 Projected Available: Available-to-promise: MPS:

(Multiple Choice)
4.7/5
(37)

What is the formula for calculating the ATP quantity at future replenishment periods?

(Multiple Choice)
5.0/5
(43)

Discuss how the MPS is evaluated in terms of cost.

(Essay)
4.7/5
(35)

Motorsports, Inc. builds two different types of motors. Model A has averaged 20,000 units annually, and Model B has average 30,000 units annually. The firm has historically used 80,000 direct labor hours and 10,000 hours of machine time per year to build Model A. Also, 150,000 annual direct labor hours have been allocated to Model B, along with 60,000 hours of annual machine time. What is the CPOPF planning factor for direct labor for Model B?

(Multiple Choice)
4.7/5
(40)

Which of the following is not part of the process for developing an MPS?

(Multiple Choice)
4.9/5
(37)

A negative number in the projected available row is ___________ a problem.

(Multiple Choice)
4.9/5
(36)

Johnny Now, Inc. produces two different models of outhouses. Demand next period is expected to be 12,000 and 18,000 units for Models A and B, respectively. Model A has CPOPF planning factors of 0.75 and 0.60 for direct labor and machine time, respectively. Model B has CPOPF planning factors of 0.50 and 0.80 for direct labor and machine time, respectively. Historically department G uses 24% of the direct labor and machine time for these products, while department H uses the remaining 76%. What is the machine time requirement for department H next period?

(Multiple Choice)
4.8/5
(38)

Which of the following is not one of the rows in an MPS record?

(Multiple Choice)
4.9/5
(34)

In an MPS record, MPS shipments arrive at the beginning of the time period.

(True/False)
4.8/5
(33)

Engines Corp. builds two different types of motors. Model A has averaged 120,000 units annually, and Model B has average 230,000 units annually. The firm has historically used 80,000 direct labor hours and 210,000 hours of machine time per year to build Model A. Also, 250,000 annual direct labor hours have been allocated to Model B, along with 60,000 hours of annual machine time. Calculate the four relevant CPOPF planning factors.

(Essay)
4.8/5
(36)

Which of the following is not a direct input into the MRP system?

(Multiple Choice)
4.8/5
(33)

Discuss why a negative number in the available-to-promise row is always a problem.

(Essay)
4.9/5
(42)

What term refers to proven capacity calculated from actual performance data?

(Multiple Choice)
4.7/5
(42)

What is the formula for calculating the ATP quantity in the action bucket?

(Multiple Choice)
4.9/5
(39)

The Master Production Schedule is often stated in:

(Multiple Choice)
4.8/5
(39)

What is the formula for projected available in an MPS record?

(Multiple Choice)
4.8/5
(28)

The available-to-promise row in an extended MPS record shows how many committed units the company has available for delivery at a given time.

(True/False)
4.9/5
(35)

Johnny Now, Inc. produces two different models of outhouses. Demand next period is expected to be 12,000 and 18,000 units for Models A and B, respectively. Model A has CPOPF planning factors of 0.75 and 0.60 for direct labor and machine time, respectively. Model B has CPOPF planning factors of 0.50 and 0.80 for direct labor and machine time, respectively. Historically department G uses 24% of the direct labor and machine time for these products, while department H uses the remaining 76%. What is the machine time requirement for department G next period?

(Multiple Choice)
4.8/5
(37)
Showing 41 - 60 of 69