Exam 7: Just-In-Time and Lean Systems
Exam 1: Introduction to Operations Management132 Questions
Exam 2: Operations Strategy and Competitiveness135 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management139 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control136 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting138 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design132 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning104 Questions
Exam 14: Resource Planning133 Questions
Exam 15: Scheduling127 Questions
Exam 16: Project Management134 Questions
Exam 16: Spreadsheet Modeling: an Introduction137 Questions
Exam 17: Spreadsheet Modeling: an Introduction133 Questions
Exam 18: Waiting Line Models132 Questions
Exam 19: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
The system of Kanbans used to coordinate delivery of goods by suppliers can include all of the following except
(Multiple Choice)
4.8/5
(30)
The principles of JIT need to be adopted by all members of a supply chain in order to have a __________.
(Short Answer)
4.8/5
(28)
Beliefs that help define the JIT philosophy include all of the following except
(Multiple Choice)
4.9/5
(41)
Just-in-time relies on __________ worker skills, meaning the ability of workers to perform many different tasks on many different machines.
(Multiple Choice)
4.8/5
(47)
The manufacturing process in JIT starts with the final assembly schedule.
(True/False)
4.9/5
(30)
What is the formula to compute the number of kanbans needed to control the production of a particular product (including the variable definitions)?
(Essay)
4.8/5
(41)
Raissa's teapot firm is moving to a JIT system. One question they are trying to answer is what level of safety stock they should maintain. They produce 240 teapots every four hours. The teapot ceramic handle vendor will deliver a container containing 30 parts one hour after they receive a request to ship. Raissa's kanban system uses four containers. What should they maintain as a safety stock?
(Short Answer)
4.8/5
(37)
According to JIT, by eliminating inventory we can clearly identify __________ and work on eliminating them.
(Multiple Choice)
4.8/5
(27)
Consider a workstation that can process 400 units per hour. It takes 3 hours to receive an order from the previous station. The container size is 50 units. The factory sets safety stock at 10 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.8/5
(35)
Matt Dillon works for a production facility that makes ball point pens. His job is to place the spring on the central ink insert. He is expected to process 200 inserts per hour. The factory uses a Kanban production system with containers that hold 50 inserts. It takes 30 minutes for Frank to receive the inserts from the previous work station. The factory sets safety stock at 40 percent of demand during lead time. How many Kanbans are needed?
(Short Answer)
4.9/5
(40)
Being able to keep costs low while changing the volume of production is an example of
(Multiple Choice)
4.9/5
(40)
Showing 41 - 60 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)