Exam 7: Just-In-Time and Lean Systems
Exam 1: Introduction to Operations Management132 Questions
Exam 2: Operations Strategy and Competitiveness135 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management139 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control136 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting138 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design132 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning104 Questions
Exam 14: Resource Planning133 Questions
Exam 15: Scheduling127 Questions
Exam 16: Project Management134 Questions
Exam 16: Spreadsheet Modeling: an Introduction137 Questions
Exam 17: Spreadsheet Modeling: an Introduction133 Questions
Exam 18: Waiting Line Models132 Questions
Exam 19: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
Without kanbans, the withdrawal and production of materials
(Multiple Choice)
4.8/5
(34)
Consider a workstation that can process 1200 units per hour. It takes 1.5 hours to receive an order from the previous station. The container size is 40 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.7/5
(31)
If the goal is to reduce the amount of inventory in the system, the number of Kanban cards should be increased.
(True/False)
4.8/5
(27)
Bottom-round management includes consensus management by committees or teams.
(True/False)
4.7/5
(36)
JIT manufacturing cannot succeed if __________costs are too high.
(Multiple Choice)
4.9/5
(38)
Regular inspections and maintenance designed to keep a machine operational is __________ maintenance.
(Multiple Choice)
4.9/5
(35)
In making specific changes to JIT manufacturing, which of the following steps should come first?
(Multiple Choice)
4.8/5
(40)
The ultimate goal of JIT is to produce products in a lot size of
(Multiple Choice)
4.8/5
(44)
An improvement tool that utilizes cross-functional teams to plan and deliver improvements to specific processes during two- or three-day marathon sessions is called a ___________________.
(Multiple Choice)
4.9/5
(37)
It the goal is to reduce the amount of inventory in the system, the number of Kanban cards should
(Multiple Choice)
4.9/5
(42)
According to JIT, __________ is carried to cover up a wide variety of problems, such as poor quality, demand uncertainty, and slow delivery.
(Multiple Choice)
4.8/5
(36)
Scheduling two, 12-hour shifts and a 4-hour housekeeping and repair shift each workday is an example of ___________________.
(Short Answer)
4.8/5
(43)
The challenge for service operations is that they have to synchronize their __________ with demand.