Multiple Choice
In a drum-buffer-rope scheduling system, the "drum" represents which of the following?
A) a drum of jobs to be selected
B) the master schedule for the operation
C) a safety stock of material
D) the constraint against too much being loaded into the master schedule
Correct Answer: