Solved

In a Drum-Buffer-Rope Scheduling System, the "Drum" Represents Which of the Following

Question 17

Multiple Choice

In a drum-buffer-rope scheduling system, the "drum" represents which of the following?


A) a drum of jobs to be selected
B) the master schedule for the operation
C) a safety stock of material
D) the constraint against too much being loaded into the master schedule

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge