Question 241
Short Answer
________ estimates the percent of time that a worker spends on various tasks.
Question 242
Multiple Choice
The visual workplace:
Question 243
Multiple Choice
ASRS stands for which of the following?
Question 244
Essay
Explain how a load-distance model helps solve problems in process layout.
Question 245
True/False
Normal time equals the average observed time multiplied by the performance rating factor.
Question 246
Multiple Choice
Labor standards are defined as the:
Question 247
Multiple Choice
Which of the following is NOT analyzed using methods techniques?
Question 248
Multiple Choice
The major problem addressed by the warehouse layout strategy is:
Question 249
Multiple Choice
Therbligs:
Question 250
Multiple Choice
A production line is to be designed to make 375 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factory operates 750 minutes per day. What is the required cycle time for this assembly line?
Question 251
Essay
Identify the formulas for the following terms that occur in assembly line balancing: (1) cycle time, (2) minimum number of workstations, and (3) efficiency.
Question 252
Multiple Choice
A manufacturing plant allows its engineers to come in at 7 A.M. plus or minus an hour but still requires them to work 8-hour days. Which of the following scheduling techniques is the firm employing?