Question 161
Multiple Choice
Which of the following is a common heuristic for assembly line balancing?
Question 162
Multiple Choice
Four of the components of job design are:
Question 163
Multiple Choice
In a product-oriented layout, what is the process of deciding how to assign tasks to workstations?
Question 164
Multiple Choice
A product-oriented layout would be MOST appropriate for which one of the following businesses?
Question 165
Multiple Choice
Mutual trust is:
Question 166
Multiple Choice
The major problem addressed by the process-oriented layout strategy is:
Question 167
Short Answer
A(n) ________ involves timing a sample of a worker's performance and using it as a basis for setting a standard time.
Question 168
Essay
What are operations charts used for?
Question 169
True/False
An operations chart analyzes the simultaneous activities of two operators.
Question 170
Multiple Choice
Which type of layout features departments or other functional groupings in which similar activities are performed?
Question 171
Multiple Choice
A restaurant manager wants to determine the percent of time the servers are working and idle using work sampling. His calculation shows that he needs to take a sample of 100 based on a z value of 2. If he wants to use a z value of 3, how many more samples does he need to take?
Question 172
True/False
The layout approach that addresses trade-offs between space and material handling is called the fixed-position layout.
Question 173
True/False
Two uses of labor standards are to determine the labor content of items produced and to determine staffing needs.
Question 174
Short Answer
When work sampling is performed to establish delay allowances, it is sometimes called a(n) ________.
Question 175
Essay
What are predetermined time standards?
Question 176
True/False
Servicescape refers to the physical surrounding in which the service is delivered.
Question 177
Multiple Choice
Which of these is the most common predetermined time standard?
Question 178
Essay
In a time study, what is the required sample size to be 99% confident that the observed average time is within Β± 3% of the actual value, if the process has a standard deviation of 1 minute and mean of 21 minutes?