Multiple Choice
A project manager is building a project network that involves testing a prototype. She must design the prototype (activity 1) , build the prototype (activity 2) , and test the prototype (activity 3) . Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3. If the prototype fails testing, she must redesign the prototype; therefore, activity 3 is a predecessor for activity 1. This is an example of
A) Conditional statements.
B) Looping.
C) Having more than one start node.
D) Good network development.
E) Natural network flow.
Correct Answer:

Verified
Correct Answer:
Verified
Q22: An activity has a duration of 10
Q23: In the network computation process what is
Q24: A(n) _ activity is frequently used to
Q25: Consider the following table of activities A
Q26: After the total slack for each activity
Q28: The minimum amount of time a dependent
Q29: It is acceptable for arrows to cross
Q30: If the project has a duration of
Q31: The critical path is the shortest path
Q32: The amount of delay within a task