Multiple Choice
Use the process flow diagram to determine which of these events has the greatest net benefit.
A) reducing the flow time at Station A from 8 to 7 minutes
B) increasing the capacity at Station B to 8 units per hour
C) increasing the capacity at Station C to 7 units per hour
D) reducing the flow time at Station D from 9 to 8 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q45: Figure 5.1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.1
Q51: The fourth step in Theory of Constraints
Q60: Table 5.6<br>Balance the following line for an
Q67: Managers should produce products with the highest
Q69: Table 5.3<br>King Supply makes four different types
Q84: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4
Q88: Line balancing strives to create workstations so
Q93: Table 5.3<br>King Supply makes four different types
Q96: Table 5.1<br>A company makes four products that
Q98: Work should be released into the system