Exam 2: A Systems View and Systems Methodology

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A boundary surrounds the system and ________ it from the environment.

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

A system is made up of subsystems, smaller systems that are part of a larger system.

Free
(True/False)
4.7/5
(40)
Correct Answer:
Verified

True

A closed system is considered to be completely ________.

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

C

Which of the following is NOT one of the interrelated components comprising the systems approach?

(Multiple Choice)
4.8/5
(34)

The environment is everything that exists outside of the system or outside of the control of the ________.

(Multiple Choice)
4.8/5
(42)

There are different types of life cycles to choose from when building a solution.

(True/False)
4.9/5
(33)

List the items that should be included in the project life cycle.

(Essay)
4.9/5
(35)

In the XP approach, ________ is/are integrated into the build process.

(Multiple Choice)
4.8/5
(30)

Describe some steps of the process during a "Close Project" phase.

(Essay)
4.8/5
(40)

The waterfall model allows for strict managerial control.

(True/False)
4.7/5
(43)

The gaps between project phases are often called "stage gates".

(True/False)
4.8/5
(40)

The Scrum approach is based on the concept that software development is a defined process.

(True/False)
4.8/5
(35)

In the Scrum approach, each phase contains one or more iterations where a(n) ________ is produced.

(Multiple Choice)
4.8/5
(36)

The main idea of Scrum is that systems development involves several environmental and technical ________ that are likely to change during the process.

(Multiple Choice)
4.8/5
(26)

Techniques such as risk analysis are tools that project managers can use to keep environment forces in check.

(True/False)
4.7/5
(37)

An element is the ________ part of a system.

(Multiple Choice)
4.9/5
(34)

A life cycle is a random order of phases in which each contains a specific deliverable which collectively deliver a result.

(True/False)
4.8/5
(39)

What is the decision making opportunity between phases or iterations in the project life cycle?

(Multiple Choice)
4.7/5
(36)

With the prototyping approach, quickly building mockups of the system components delays feedback from users.

(True/False)
4.7/5
(38)

Each project ________ should have defined deliverables and criteria that signal that it is time to move to the next.

(Multiple Choice)
4.8/5
(33)