Exam 7: Project Quality and Communications Planning
Exam 1: Introduction to Project Management79 Questions
Exam 2: A Systems View and Systems Methodology80 Questions
Exam 3: The Project Management Framework80 Questions
Exam 4: Project Initiation80 Questions
Exam 5: Project Scope and Human Resource Planning75 Questions
Exam 6: Project Time and Cost Planning80 Questions
Exam 7: Project Quality and Communications Planning80 Questions
Exam 8: Project Risk Management Planning80 Questions
Exam 9: Project Procurement Planning80 Questions
Exam 10: Project Execution80 Questions
Exam 11: Project Monitoring and Control, Part I80 Questions
Exam 12: Project Monitoring and Control, Part II80 Questions
Exam 13: Project Closure80 Questions
Exam 14: Advanced Topics in Project Management81 Questions
Select questions type
A cost and time disparity estimate exists that it's ________ times more expensive to find an error after the system is deployed than to find that error during requirements discovery.
Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
B
An affinity diagram is a group decision-making technique designed to sort a large number of ideas, concepts, and opinions into a set of organized groups.
Free
(True/False)
4.9/5
(37)
Correct Answer:
True
A program is generally a collection of related projects that are being managed in a coordinated way to obtain benefits and control not available from managing them individually.
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
A
Quality management planning is so important that many authors add it to the triple constraint of projects (scope, time, cost).
(True/False)
4.9/5
(43)
The OPM3 maturity model has three levels of maturity, and each level can exist at a different domain of project management.
(True/False)
4.8/5
(34)
Brainstorming can be conducted with or without ________ diagrams.
(Multiple Choice)
4.7/5
(37)
It has been estimated that as much as 90 percent of a project manager's time is spent in some form of communication.
(Multiple Choice)
5.0/5
(31)
This is the time and expense needed to restore the product to an acceptable level of performance after it has failed or begun a trend toward failure.
(Multiple Choice)
4.7/5
(21)
The communications management plan should include description of known oral exchanges of information, as well, such as when and where status meetings will occur.
(True/False)
4.8/5
(40)
This is the probability of a product performing as specified without failure over a set period of time.
(Multiple Choice)
4.9/5
(32)
A program is generally a collection of related projects that are being managed in a coordinated way to obtain benefits and control not available from managing them individually.
(True/False)
4.7/5
(39)
Which of the following is NOT one of the processes of the Communications Management knowledge area in the PMBOK?
(Multiple Choice)
4.9/5
(27)
This is a statistical method to help identify the factors that have influence on the quality of a product or process.
(Multiple Choice)
4.8/5
(37)
The Ishikawa diagram is commonly referred to as a skull diagram because of its resemblance to the skeleton of a skeleton.
(True/False)
4.9/5
(31)
The OPM3 cycle consists of four steps: prepare for assessment; perform assessment; plan for improvements; implement improvements.
(True/False)
4.8/5
(38)
Which of the following is NOT a benefit of achieving CMMI-defined maturity?
(Multiple Choice)
4.8/5
(33)
In Six Sigma methodology, a normal distribution is a bell-shaped curve that is symmetrical about the mean.
(True/False)
4.7/5
(20)
The first step in the process used to build the communications management plan is:
(Multiple Choice)
4.8/5
(20)
The key issue with implementing a balanced scorecard is to make sure you pick the right metrics.
(True/False)
4.8/5
(30)