Exam 7: Project Quality and Communications Planning

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A cost and time disparity estimate exists that it's ________ times more expensive to find an error after the system is deployed than to find that error during requirements discovery.

Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
Verified

B

An affinity diagram is a group decision-making technique designed to sort a large number of ideas, concepts, and opinions into a set of organized groups.

Free
(True/False)
4.9/5
(37)
Correct Answer:
Verified

True

A program is generally a collection of related projects that are being managed in a coordinated way to obtain benefits and control not available from managing them individually.

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

Quality management planning is so important that many authors add it to the triple constraint of projects (scope, time, cost).

(True/False)
4.9/5
(43)

The OPM3 maturity model has three levels of maturity, and each level can exist at a different domain of project management.

(True/False)
4.8/5
(34)

Brainstorming can be conducted with or without ________ diagrams.

(Multiple Choice)
4.7/5
(37)

It has been estimated that as much as 90 percent of a project manager's time is spent in some form of communication.

(Multiple Choice)
5.0/5
(31)

This is the time and expense needed to restore the product to an acceptable level of performance after it has failed or begun a trend toward failure.

(Multiple Choice)
4.7/5
(21)

The communications management plan should include description of known oral exchanges of information, as well, such as when and where status meetings will occur.

(True/False)
4.8/5
(40)

This is the probability of a product performing as specified without failure over a set period of time.

(Multiple Choice)
4.9/5
(32)

A program is generally a collection of related projects that are being managed in a coordinated way to obtain benefits and control not available from managing them individually.

(True/False)
4.7/5
(39)

Which of the following is NOT one of the processes of the Communications Management knowledge area in the PMBOK?

(Multiple Choice)
4.9/5
(27)

This is a statistical method to help identify the factors that have influence on the quality of a product or process.

(Multiple Choice)
4.8/5
(37)

The Ishikawa diagram is commonly referred to as a skull diagram because of its resemblance to the skeleton of a skeleton.

(True/False)
4.9/5
(31)

The OPM3 cycle consists of four steps: prepare for assessment; perform assessment; plan for improvements; implement improvements.

(True/False)
4.8/5
(38)

Which of the following is NOT a benefit of achieving CMMI-defined maturity?

(Multiple Choice)
4.8/5
(33)

In Six Sigma methodology, a normal distribution is a bell-shaped curve that is symmetrical about the mean.

(True/False)
4.7/5
(20)

The first step in the process used to build the communications management plan is:

(Multiple Choice)
4.8/5
(20)

Explain the Pareto principle.

(Essay)
4.8/5
(38)

The key issue with implementing a balanced scorecard is to make sure you pick the right metrics.

(True/False)
4.8/5
(30)