Exam 21: Just-In-Time and Lean Production

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The sole purpose of housekeeping in JIT/lean operations is to enhance safety in the workplace.

(True/False)
4.8/5
(36)

In a "pull system," a pile of inventory in front of a workstation indicates problems at that workstation.

(True/False)
4.8/5
(43)

Which of the following is not true about worker/management roles and relations for JIT?

(Multiple Choice)
4.9/5
(44)

Which one of the following is not affiliated with product design to support JIT/lean operations?

(Multiple Choice)
4.8/5
(29)

Which of the following are benefits of level capacity loading?

(Multiple Choice)
4.8/5
(33)

JIT/lean is best suited for a corporate environment of mutual respect and _______.

(Multiple Choice)
4.8/5
(37)

Manufacturing cells are commonly used in JIT systems

(True/False)
4.8/5
(36)

Of the following,which is an obstacle to JIT/lean conversion?

(Multiple Choice)
4.7/5
(43)

In the JIT philosophy,the smaller the lot size,the better.

(True/False)
4.8/5
(46)

In a broad sense,JIT is identical to lean production.

(True/False)
4.9/5
(46)

Inventory reduction is another aspect of lean that can apply to services.

(True/False)
4.9/5
(42)

Waiting time is not considered a waste in the JIT philosophy.

(True/False)
4.7/5
(39)

With regard to suppliers,JIT systems typically involve:

(Multiple Choice)
4.9/5
(40)

A benefit of JIT is the flexibility to handle a mix of products within a short time frame.

(True/False)
4.8/5
(42)

Kanban is a system of lights used to signal problems or slowdowns in a production process.

(True/False)
4.8/5
(34)

It is primarily manufacturing personnel that are required to support a JIT system.

(True/False)
4.8/5
(40)

Underutilization of employee knowledge/skill is considered waste in a lean production environment.

(True/False)
4.9/5
(39)

A fundamental tenet of the JIT philosophy is that workers are assets,not a cost element.

(True/False)
4.8/5
(33)

Which of the following is not associated with converting to cellular layouts?

(Multiple Choice)
4.9/5
(32)

Reductions in setup time are necessary to make a JIT system feasible.

(True/False)
4.9/5
(43)
Showing 41 - 60 of 89
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)