Exam 20: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management80 Questions
Exam 2: Competitiveness, strategic Planning, and Productivity62 Questions
Exam 3: Demand Forecasting171 Questions
Exam 4: Product Design103 Questions
Exam 5: Reliability63 Questions
Exam 6: Strategic Capacity Planning75 Questions
Exam 7: Decision Analysis70 Questions
Exam 8: Process Design and Facility Layout169 Questions
Exam 9: Linear Programming98 Questions
Exam 10: Workjob Design147 Questions
Exam 11: Learning Curves67 Questions
Exam 12: Location Planning and Analysis69 Questions
Exam 13: the Transportation Model18 Questions
Exam 14: Management of Quality112 Questions
Exam 15: Statistical Quality Control132 Questions
Exam 16: Acceptance Sampling64 Questions
Exam 17: Supply Chain Management103 Questions
Exam 18: Inventory Management157 Questions
Exam 19: Aggregate Operations Planning and Master Scheduling73 Questions
Exam 20: Material Requirements Planning and Enterprise Resource Planning78 Questions
Exam 21: Just-In-Time and Lean Production89 Questions
Exam 22: Maintenance27 Questions
Exam 23: Job and Staff Scheduling116 Questions
Exam 24: Project Management131 Questions
Exam 25: Waiting-Line Analysis79 Questions
Exam 26: Simulation44 Questions
Select questions type
Load reports show capacity requirements for departments or work centres.
Free
(True/False)
4.7/5
(41)
Correct Answer:
True
The part-period method for lot sizing attempts to balance setup and holding costs.
Free
(True/False)
4.8/5
(41)
Correct Answer:
True
The MRP requires a list of the individual parts that will be converted to finished goods.
Free
(True/False)
4.7/5
(45)
Correct Answer:
True
Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule:
What is the part-period method lot size for the order for the first period?

(Multiple Choice)
4.9/5
(31)
Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule:
What is the lot size for the second order using the part-period method?

(Multiple Choice)
4.8/5
(40)
For relatively stable situations,a net-change MRP is better suited than using regenerative MRP.
(True/False)
4.8/5
(42)
Ignoring the possibility of safety stock requirements,which one of the following most closely describes the calculation of net requirements for an item in MRP?
(Multiple Choice)
4.8/5
(40)
ERP automates the tasks involved in performing a business process,such as order fulfilment and financial reporting.
(True/False)
4.8/5
(35)
ERP involves software that is used to manage and coordinate all the resources,information,and functions of an organization from a shared database.
(True/False)
4.7/5
(36)
The MRP input stating which end items are to be produced,when they are needed,and what quantities are needed,is the:
(Multiple Choice)
4.7/5
(35)
Which of the following most closely describes dependent demand?
(Multiple Choice)
4.7/5
(38)
In MRP,under lot-for-lot ordering,the size of "planned-order receipts" are equal to:
(Multiple Choice)
4.9/5
(39)
Great Product,Ltd.has just received an order for 100 Whozats,which must be ready for delivery at the start of week six.An MRP planner has prepared the following table showing product structure,lead times (orders are lot-for-lot),and quantities on hand:
How many Wherezats should be ordered?

(Multiple Choice)
4.8/5
(40)
Given the following information,develop a material requirements plan that will yield 400 units of product P at the start of week 7.
11eab92b_c482_0992_99e6_c1c02018d3a4
(Essay)
4.7/5
(42)
A phantom bill is a special type of bill of material that is a combination of the bill of materials for a number of subassemblies.
(True/False)
4.7/5
(36)
Configuring the ERP software involves reengineering established business processes to align with the ERP's procedural settings.
(True/False)
5.0/5
(43)
Which one of the following is not an input in an MRP system?
(Multiple Choice)
4.8/5
(37)