Exam 21: Just-In-Time and Lean Production
Exam 1: Introduction to Operations Management80 Questions
Exam 2: Competitiveness, strategic Planning, and Productivity62 Questions
Exam 3: Demand Forecasting171 Questions
Exam 4: Product Design103 Questions
Exam 5: Reliability63 Questions
Exam 6: Strategic Capacity Planning75 Questions
Exam 7: Decision Analysis70 Questions
Exam 8: Process Design and Facility Layout169 Questions
Exam 9: Linear Programming98 Questions
Exam 10: Workjob Design147 Questions
Exam 11: Learning Curves67 Questions
Exam 12: Location Planning and Analysis69 Questions
Exam 13: the Transportation Model18 Questions
Exam 14: Management of Quality112 Questions
Exam 15: Statistical Quality Control132 Questions
Exam 16: Acceptance Sampling64 Questions
Exam 17: Supply Chain Management103 Questions
Exam 18: Inventory Management157 Questions
Exam 19: Aggregate Operations Planning and Master Scheduling73 Questions
Exam 20: Material Requirements Planning and Enterprise Resource Planning78 Questions
Exam 21: Just-In-Time and Lean Production89 Questions
Exam 22: Maintenance27 Questions
Exam 23: Job and Staff Scheduling116 Questions
Exam 24: Project Management131 Questions
Exam 25: Waiting-Line Analysis79 Questions
Exam 26: Simulation44 Questions
Select questions type
Continuous improvement and flexible systems are requirements for successful JIT and lean systems.
(True/False)
4.8/5
(42)
An advantage of JIT cross-trained workers is they can help other workers when bottlenecks occur.
(True/False)
4.8/5
(32)
Which of the following is not included in world class manufacturing?
(Multiple Choice)
4.9/5
(39)
In relation to lean,it can be difficult for an organization to change its culture within a short time.
(True/False)
4.8/5
(35)
The technique intended to increase functional communications,reduce the need for changes and speed up the design process is called:
(Multiple Choice)
4.9/5
(37)
A JIT/lean system is not effective when the industry consists of a tiered supplier network.
(True/False)
4.9/5
(27)
Which of the following is a characteristic of the JIT philosophy?
(Multiple Choice)
5.0/5
(40)
Which of the following are potentially negative aspects of cross-functionally trained workers?
(Multiple Choice)
4.9/5
(43)
A set of tools and methods for reducing setup time developed by Shigeo Shingo is called:
(Multiple Choice)
4.9/5
(29)
The control of the flow of work in JIT systems can be characterized as a backward communication approach.
(True/False)
4.9/5
(42)
Which of the following is not a benefit of small lot sizes in JIT systems?
(Multiple Choice)
4.8/5
(40)
The ultimate goal of a lean system is to achieve a balanced,rapid flow of materials through the system.
(True/False)
4.8/5
(34)
A major difference between kanban and MRP in scheduling the products to be built is that kanban is primarily a manual system.
(True/False)
4.7/5
(26)
JIT philosophy tries to eliminate work-in-process inventory because:
(Multiple Choice)
4.7/5
(43)
Which of the following does not contribute to reduced setup time and cost?
(Multiple Choice)
4.8/5
(36)
A visual tool consisting of process flow diagrams that includes information flows and the activity times refers to:
(Multiple Choice)
4.8/5
(37)
Showing 61 - 80 of 89
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)