Exam 23: Transportation, Assignment, and Network Algorithms
Exam 1: Introduction to Quantitative Analysis96 Questions
Exam 2: Probability Concepts and Applications155 Questions
Exam 3: Decision Analysis128 Questions
Exam 4: Regression Models129 Questions
Exam 5: Forecasting138 Questions
Exam 6: Inventory Control Models147 Questions
Exam 7: Linear Programming Models: Graphical and Computer Methods141 Questions
Exam 8: Linear Programming Applications89 Questions
Exam 9: Transportation, Assignment, and Network Models112 Questions
Exam 10: Integer Programming, Goal Programming, and Nonlinear Programming86 Questions
Exam 11: Project Management142 Questions
Exam 12: Waiting Lines and Queuing Theory Models127 Questions
Exam 13: Simulation Modeling94 Questions
Exam 14: Markov Analysis103 Questions
Exam 15: Statistical Quality Control96 Questions
Exam 16: Analytic Hierarchy Process66 Questions
Exam 17: Dynamic Programming86 Questions
Exam 18: Decision Theory and the Normal Distribution62 Questions
Exam 19: Game Theory59 Questions
Exam 20: Mathematical Tools: Determinants and Matrices104 Questions
Exam 21: Calculus-Based Optimization39 Questions
Exam 22: Linear Programming: The Simplex Method98 Questions
Exam 23: Transportation, Assignment, and Network Algorithms120 Questions
Select questions type
When using the shortest-route technique, the first step is to
(Multiple Choice)
5.0/5
(35)
The shortest-route technique might be used by someone planning a vacation in order to minimize the required amount of driving.
(True/False)
4.8/5
(42)
In the maximal-flow technique, a zero (0)always means no flow or a one-way arc.
(True/False)
4.9/5
(35)
A sprinkler service is analyzing the flow of water through pipes in your front yard.The flow capacities are given in the table below.Flow is measured in 100 gallons/hour.What is the maximal flow from node 1 to node 7?


(Short Answer)
4.9/5
(27)
A typical transportation problem may ask the question, "How many of X should be shipped to point E from source A?"
(True/False)
4.8/5
(27)
Assignment problems involve determining the most efficient assignment of people to projects, salesmen to territories, contracts to bidders, and so on.
(True/False)
4.7/5
(24)
LW Enterprises is a specialty cat breeder with operations located in Wichita, Oklahoma City, Nashville, Lubbock and Enumclaw.These cats are used as historical reenactors on US Civil War battlefields throughout the summer months.Clad in Union blue or Confederate gray and equipped with their tiny rifles and saucers of milk, they thrill crowds of Civil War buffs from Gettysburg all the way down to Vicksburg.The cost (in dollars)of shipping each cat from all possible combinations of supply and demand locations is shown in the table.
How many cats should be shipped from each plant to each battlefield in order to minimize shipping costs? What is the total minimum shipping cost?

(Essay)
4.9/5
(33)
When using a general LP model for transportation problems, if there are 4 sources and 3 destinations, which of the following statements is true?
(Multiple Choice)
4.8/5
(30)
Given the following traffic flows, in hundreds of cars per hour, what is the maximum traffic flow from City 1 to City 7? 

(Multiple Choice)
4.9/5
(45)
Which of the following problems can be solved as a linear program using binary decision variables?
(Multiple Choice)
4.8/5
(35)
Using the stepping-stone method to solve a maximization problem, we would choose the route with the largest positive improvement index.
(True/False)
4.9/5
(32)
Table M8-17
Mr.Miyagi hires the Magnificent Seven to take care of a few chores around his house while he spends some quality time with his young protegee.Each of the Magnificent Seven quotes Mr.Miyagi a price for the seven tasks and Mr.Miyagi would like to pay as little as possible for all seven.
-Given the helpers and the tasks in Table M8-17, who should Prune Tree in order to minimize the overall total cost?

(Multiple Choice)
4.9/5
(28)
The west-to-east air traffic system passing through the United States can handle aircraft flows with capacities in hundreds of planes per hour as shown.What is the peak air traffic load (From City 1 to City 5)in aircraft per hour that this system can handle?


(Essay)
4.9/5
(25)
The assignment problem is a special case of the transportation problem.So, then, why is it not recommended to use the transportation algorithm to solve the assignment problem?
(Short Answer)
4.7/5
(39)
Table M8-16
A transportation network consists of ten branches connecting seven nodes as shown in the table.
-What is the shortest route from Node 1 to Node 5 in the transportation network represented in Table M8-16.

(Multiple Choice)
4.7/5
(32)
Which of the following is an applicable characteristic in using the stepping-stone method?
(Multiple Choice)
4.9/5
(28)
Logistics companies would definitely be interested in the shortest-route technique to optimize travel.
(True/False)
4.8/5
(40)
One of the advantages of the stepping-stone method is that if, at a particular iteration, we accidentally choose a route that is not the best, the only penalty is to perform additional iterations.
(True/False)
4.8/5
(28)
Showing 81 - 100 of 120
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)