Exam 6: Resource Utilization

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Resource leveling, or smoothing, is a method for

(Multiple Choice)
4.8/5
(34)

Resource-limited scheduling attempts a schedule in which the number of resources is limited and

(Multiple Choice)
4.8/5
(40)

Resources in a project are

(Multiple Choice)
4.8/5
(40)

Activities in a network diagram are drawn in a ____ relationship because, from a technical standpoint, they must be performed in that sequence.

(Multiple Choice)
4.7/5
(29)

This example has level resources of three resources for eight days.If the project is limited to two resources, how should the project be organized to meet the resource constraint and finish the project as early as possible? The tasks with the least slack have the lower number. This example has level resources of three resources for eight days.If the project is limited to two resources, how should the project be organized to meet the resource constraint and finish the project as early as possible? The tasks with the least slack have the lower number.

(Multiple Choice)
4.8/5
(42)

Resource utilization charts based on each activity's latest start time are said to be based

(Multiple Choice)
4.9/5
(25)

Resource-limited scheduling will not extend the project completion time if necessary in order to keep within the resource limits.

(True/False)
4.8/5
(42)

The resource requirements plan illustrates

(Multiple Choice)
4.8/5
(49)

The start of noncritical activities are delayed beyond their earliest start times (but not beyond their latest start times)in order to

(Multiple Choice)
4.8/5
(41)

If three activities are using the same resource, the network diagram must be draw

(Multiple Choice)
4.8/5
(41)

When several activities need the same limited resource at the same time, the activities with

(Multiple Choice)
4.7/5
(47)

Select which of the following does not describe how the sequence of activities can be drawn to reflect the availability of a limited quantity of resources.

(Multiple Choice)
4.8/5
(38)

Resource leveling, or smoothing, levels the resources so that

(Multiple Choice)
4.8/5
(34)

Which of following would allow for level resources on the project?

(Multiple Choice)
4.8/5
(28)

____ is an iterative method in which resources are allocated to activities based on the least slack.

(Multiple Choice)
4.9/5
(43)

In addition to showing the technical constraints among activities, how does the network logic also take into account resource constraints?

(Multiple Choice)
4.9/5
(38)

Why are activities drawn in a serial relationship in a network diagram?

(Multiple Choice)
4.8/5
(36)

If not enough resources are available for a project, to maintain the same project scope and budget, the project team should

(Multiple Choice)
4.8/5
(35)

In resource-limited scheduling, the lower priority activities get delayed.How does the delaying of activities affect the project?

(Multiple Choice)
4.8/5
(38)

Resource utilization charts based on each activity's earliest start time are said to be based on an ____ schedule.

(Multiple Choice)
4.8/5
(37)