Exam 11: Managing Systems Implementation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The principles of cohesion and coupling do not apply to object-oriented application development.

(True/False)
4.9/5
(34)

_____ involves more risk than other changeover methods.

(Multiple Choice)
4.8/5
(45)

The main objective of _____ is to avoid problems or to identify them as soon as possible.

(Multiple Choice)
4.8/5
(31)

Agile projects use various iterative and incremental models.

(True/False)
4.8/5
(37)

Data conversion is easier when a new system replaces a manual system because all data can be entered manually,unless it must be scanned.

(True/False)
4.8/5
(29)

_____ measures a module's scope and processing characteristics.

(Multiple Choice)
4.9/5
(33)

Testing two or more programs that depend on each other is called _____.

(Multiple Choice)
4.8/5
(35)

System developers use _____ to document and trail program defects,code changes,and replacement code.

(Multiple Choice)
4.8/5
(41)

In a structure chart,a curved arrow represents a _____,which indicates that one or more modules are repeated.

(Multiple Choice)
4.9/5
(31)

A class diagram includes the class _____,which describe the characteristics of objects in the class.

(Multiple Choice)
4.8/5
(35)

Language and grammar errors are referred to as script errors.

(True/False)
4.9/5
(31)

The objective of _____ is to identify and eliminate execution errors that could cause a program to terminate abnormally,and logic errors that could have been missed during desk checking.

(Multiple Choice)
4.7/5
(21)

Program documentation _____.

(Multiple Choice)
4.7/5
(27)

Cohesion describes the degree of interdependence among modules.

(True/False)
4.8/5
(28)

Meshing is the process of turning program logic into specific instructions that the computer system can execute.

(True/False)
4.7/5
(34)

When developing a training program,which guideline should be kept in mind?

(Multiple Choice)
4.7/5
(37)

_____ is the process of constructing the programs and code modules that serve as the building blocks of an information system.

(Multiple Choice)
4.9/5
(36)

Successful completion of system testing is the key to user and management approval,which is why system tests sometimes are called _____.

(Multiple Choice)
4.8/5
(30)

Commercial software packages must undergo unit and integration testing similar to that of in-house developed systems,although system testing usually is not performed.

(True/False)
4.8/5
(37)

Although programmers perform the actual coding,IT managers usually assign systems analysts to work with them as part of a team.

(True/False)
5.0/5
(37)
Showing 21 - 40 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)