Exam 11: Managing Systems Implementation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

XP is an agile development method.

(True/False)
4.7/5
(31)

Structured application development usually involves a(n)_____,which proceeds from a general design to a detailed structure.

(Multiple Choice)
4.8/5
(30)

_____ is the process of reviewing program code to spot logic errors,which produce incorrect results.

(Multiple Choice)
4.9/5
(31)

During _____,programmers must test programs that interact with other programs and files separately before they are integrated into the system.

(Multiple Choice)
4.8/5
(35)

  -As the accompanying figure illustrates,the _____ changeover method involves implementing the complete new system at a selected location of the company. -As the accompanying figure illustrates,the _____ changeover method involves implementing the complete new system at a selected location of the company.

(Multiple Choice)
4.8/5
(39)

Using flowcharts,programmers can break large systems into subsystems that are easier to understand and code.

(True/False)
4.9/5
(33)

User documentation _____.

(Multiple Choice)
4.9/5
(34)

After a systems analyst documents the system's requirements,he or she breaks the system down into subsystems and modules in a process called scaling.

(True/False)
4.7/5
(29)

List the objectives of system testing.

(Essay)
4.8/5
(35)

_____ is the process of putting a new information system online and retiring the old system.

(Multiple Choice)
4.9/5
(39)

_____ requires that a software supplier document all testing and maintain records of test results.

(Multiple Choice)
4.8/5
(44)

A(n)_____ refers to a web-based broadcast that allows a user to download multimedia files to a PC or portable device.

(Multiple Choice)
4.8/5
(30)

Lisa mentions that one program has been developed to interact with other programs,and she wants to begin by testing the programs individually.Tina tells her about a process in which a programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully.What is the name of this process?

(Multiple Choice)
4.9/5
(33)

In a structure chart,a control couple shows a message,also called a(n)_____,which one module sends to another.

(Multiple Choice)
4.7/5
(24)

Test data should contain only correct data.

(True/False)
4.7/5
(29)

Program documentation describes the system's functions and how they are implemented.

(True/False)
4.9/5
(39)

Which is specified by the detailed procedures in a test plan?

(Multiple Choice)
4.9/5
(32)

The environment for the actual system operation is called the _____.

(Multiple Choice)
4.9/5
(44)

During _____,existing data is loaded into the new system.

(Multiple Choice)
4.9/5
(38)

In _____,two programmers work on the same task on the same computer;one drives while the other navigates.

(Multiple Choice)
4.7/5
(28)
Showing 41 - 60 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)