Specially trained individuals in advanced quality tools who perform Six Sigma projects are known as green belts.

Free
(True/False)
4.9/5
(35)
Correct Answer:
Verified

False

The defect rate in a Six Sigma process is about ________ per million parts.

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

A

In a production plant,800 parts per day are needed.A standard container holds 100 parts.It takes half a day to receive parts once the move card is released.A safety stock of 100 parts is usually maintained.What is the number of kanban cards needed?

Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
Verified

C

An approach to improving product and process through an emphasis on system and product design is known as ________.

(Short Answer)
4.9/5
(39)

When all levels of management and workers are actively involved in process management and in achieving lean practices,it is known as ________.

(Short Answer)
4.8/5
(25)

Define Six Sigma Management.

(Essay)
4.8/5
(36)

An acronym that organizes Six Sigma initiatives in five phases is ________.

(Short Answer)
4.7/5
(44)

The task of selecting process outcomes will be performed in which phase of the Six Sigma DMAIC process?

(Multiple Choice)
4.9/5
(37)

The restrictor in an automobile gas tank that will not allow pumping the wrong type of fuel in your tank (e.g.pumping diesel fuel in a gasoline tank)is an example of

(Multiple Choice)
4.8/5
(35)

N = 4 is a form of a lean acceptance sampling technique.

(True/False)
4.7/5
(37)

The letter "D" in the Six Sigma acronym DMAIC stands for

(Multiple Choice)
4.9/5
(30)

The kanban card that allows materials to be pulled from inventory and placed into a production process to save a step in ordering materials is called the ________ card.

(Short Answer)
4.7/5
(15)

The kanban card used to transport parts from one location to another is called the ________ card.

(Short Answer)
4.8/5
(33)

Discuss the philosophy of Change Management and what it involves.What is the role of Six Sigma and lean principles in Change Management?

(Essay)
4.8/5
(33)

As per the Risk and Return evaluation matrix for Six Sigma projects,projects that are low hanging fruit have a

(Multiple Choice)
4.9/5
(29)

A withdrawal kanban card is usually used when a defective part is received.

(True/False)
4.9/5
(34)

The process of guiding improvement in an organization is known as ________.

(Short Answer)
5.0/5
(37)

A production kanban card usually contains bill of materials information for incoming parts or components.

(True/False)
4.8/5
(44)

Specially trained individuals in advanced quality tools who perform Six Sigma projects are known as ________.

(Short Answer)
4.8/5
(36)

What is andon?

(Short Answer)
4.8/5
(36)