Exam 3: Product and Process Design and Mapping
Exam 1: Introduction to Supply Chain and Operations Management89 Questions
Exam 2: Supply Chain and Operations Strategy71 Questions
Exam 3: Product and Process Design and Mapping84 Questions
Exam 4: Service Design97 Questions
Exam 5: Customer Relationship Management60 Questions
Exam 6: Strategic Sourcing78 Questions
Exam 7: Supplier Management64 Questions
Exam 8: Demand Management and Forecasting81 Questions
Exam 9: Inventory Management Fundamentals and Independent Demand84 Questions
Exam 10: Sales and Operations Planning and Enterprise Resource Planning115 Questions
Exam 11: Logistics86 Questions
Exam 12: Project Management90 Questions
Exam 13: Supply Chain Quality Management84 Questions
Exam 14: Statistical Process Control80 Questions
Exam 15: New Section76 Questions
Select questions type
Goods that use similar technologies that can coexist in a family of products are known as ________.
Free
(Short Answer)
4.9/5
(36)
Correct Answer:
complementary products
The first phase of the product life cycle is
Free
(Multiple Choice)
4.9/5
(46)
Correct Answer:
A
Kodak's design of their FunSaver camera so that it snaps apart easily is an example of (choose two)
Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
A,C
Concurrent engineering involves performing the different tasks of design sequentially.
(True/False)
4.9/5
(32)
Comparing various process options and their relationship to volume and variety can be accomplished using
(Multiple Choice)
4.8/5
(31)
A process that represents a trade-off between mass assembly operations and job shops in terms of flexibility and production volumes is known as ________.
(Short Answer)
4.9/5
(37)
In a fixed position layout,the workstation stays fixed and product moves from workstation to workstation.
(True/False)
4.9/5
(36)
The tool used to compare various process options and their relationship to volume and variety is known as ________.
(Short Answer)
4.8/5
(34)
The fact that a product is more likely to fail either very early in its life or late in its useful life is called the
(Multiple Choice)
4.7/5
(29)
Use the information below to answer the following question(s).
A production line operates for 450 minutes per day.Desired production volume is 80 units per day.Total task time to make the product is 56 minutes.
-What is the optimal cycle time?
(Multiple Choice)
4.9/5
(33)
Goods that use similar technologies that can coexist in a family of products are known as substitute products.
(True/False)
4.9/5
(39)
Concurrent engineering involves performing the different tasks of design
(Multiple Choice)
4.9/5
(32)
The process which is most capital-intensive and often requires very specialized technology is ________.
(Short Answer)
4.9/5
(46)
The model used in designing functional layouts where movement is minimized is called the
(Multiple Choice)
4.9/5
(34)
Showing 1 - 20 of 84
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)