Exam 2: The Project Management Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An organizations' culture often influences the projects it undertakes.

Free
(True/False)
4.8/5
(34)
Correct Answer:
Verified

True

The second phase of the systems development life cycle is called:

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

D

The five process groups identified by the PMBOK are initiating, planning, executing, monitoring and controlling, and ___________ .

Free
(Short Answer)
4.8/5
(45)
Correct Answer:
Verified

closing

Persons, groups of people, pieces of equipment, or materials used in accomplishing an activity are called:

(Multiple Choice)
4.7/5
(44)

The critical path represents the ___________time in which a project can be completed.

(Short Answer)
4.9/5
(40)

Projects are divided into smaller parts called ___________.

(Short Answer)
4.7/5
(39)

Risk estimation is part of which process group?

(Multiple Choice)
4.8/5
(37)

Defining a problem correctly means distinguishing between___________ .

(Short Answer)
4.9/5
(39)

The five phases of the systems development life cycle include all EXCEPT:

(Multiple Choice)
4.9/5
(35)

Process groups are ___________by the results they produce.

(Short Answer)
4.9/5
(29)

Correctly defining a problem is critical for successful problem solving.

(True/False)
4.8/5
(37)

The process group concerned with authorizing a project to begin is called ___________ .

(Short Answer)
4.7/5
(38)

What is NOT characteristic of a network diagram?

(Multiple Choice)
4.9/5
(34)

Social, economic, and environmental influences are comprised of:

(Multiple Choice)
4.8/5
(36)

The critical path of a network diagram is represented by the sequence of connected activities that produce the ___________overall time period.

(Short Answer)
4.9/5
(40)

The third phase of the systems development life cycle is called:

(Multiple Choice)
4.9/5
(34)

Describe a projectized organization structure and its effect on the organization's projects.

(Essay)
4.9/5
(43)

Problem solving consists of:

(Multiple Choice)
5.0/5
(31)

Projects are divided into smaller parts called:

(Multiple Choice)
4.8/5
(45)

The sequence of activities whose order and durations directly affect the completion date of a project is called___________ .

(Short Answer)
4.9/5
(30)
Showing 1 - 20 of 119