Exam 2: The Project Management Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Some systems analysts consider the life cycle to be:

(Multiple Choice)
5.0/5
(40)

The organizational unit created to centralize and coordinate projects within an organization is called:

(Multiple Choice)
4.9/5
(47)

Failure to identify a key stakeholder can cause major problems for a project.

(True/False)
4.7/5
(36)

Developing a project charter is part of which process group?

(Multiple Choice)
4.8/5
(46)

A functional organization structure can be thought of as a pyramid.

(True/False)
4.8/5
(29)

The process group concerned with formal acceptance of a project is called ___________.

(Short Answer)
4.9/5
(36)

What is NOT a characteristic of a Gantt chart?

(Multiple Choice)
4.8/5
(38)

In an organization with a projectized structure, team members belong to different functional areas.

(True/False)
4.8/5
(36)

Problem solving has two aspects: ___________and decision making.

(Short Answer)
4.7/5
(40)

The___________ expected completion time refers to the time in which an activity can be completed without delaying the project.

(Short Answer)
4.8/5
(38)

A weak matrix organization structure resembles to some extent a functional organization.

(True/False)
4.9/5
(41)

Compliance with regulations is___________ .

(Short Answer)
4.9/5
(28)

Nodes not on the critical contain slack time.

(True/False)
4.7/5
(37)

The organizational unit created to centralize and coordinate the projects within an organization is called ___________.

(Short Answer)
4.9/5
(37)

Describe the systems analysis phase of the systems development life cycle.

(Essay)
4.9/5
(35)

The fifth phase in the SDLC is called___________ .

(Short Answer)
4.8/5
(33)

During systems design, the descriptions of the recommended alternative are converted into physical and then logical design.

(True/False)
4.7/5
(39)

The final phase of the systems development life cycle is called:

(Multiple Choice)
4.9/5
(27)

You should use a network diagram when:

(Multiple Choice)
4.9/5
(38)