Exam 21: Statistical Methods for Quality Control
Exam 1: Data and Statistics84 Questions
Exam 2: Descriptive Statistics: Tabular and Graphical Displays67 Questions
Exam 3: Descriptive Statistics: Numerical Measures118 Questions
Exam 4: Introduction to Probability94 Questions
Exam 5: Discrete Probability Distributions84 Questions
Exam 6: Continuous Probability Distributions121 Questions
Exam 7: Sampling and Sampling Distributions116 Questions
Exam 8: Interval Estimation90 Questions
Exam 9: Hypothesis Tests95 Questions
Exam 10: Inference About Means and Proportions With Two Populations63 Questions
Exam 11: Inferences About Population Variances66 Questions
Exam 12: Comparing Multiple Proportions, Tests of Independence and Goodness of Fit59 Questions
Exam 13: Experimental Design and Analysis of Variance76 Questions
Exam 14: Simple Linear Regression132 Questions
Exam 15: Multiple Regression103 Questions
Exam 16: Regression Analysis: Model Building41 Questions
Exam 17: Time Series Analysis and Forecasting51 Questions
Exam 18: Nonparametric Methods58 Questions
Exam 19: Decision Analysis48 Questions
Exam 20: Index Numbers39 Questions
Exam 21: Statistical Methods for Quality Control60 Questions
Exam 22: Sample Survey48 Questions
Select questions type
We can examine the effect of the sampling plan on both types of risks by varying the assumed
Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
A
The upper and lower control limits of the mean of a process are 66 and 54. Samples of size 25 are used for the inspection process. Determine the mean and the standard deviation for this process.
Free
(Short Answer)
4.8/5
(33)
Correct Answer:
Mean = 60
Standard deviation = 10
Variations in process output that are due to factors in the production process such as machine tools wearing out are _____ causes.
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
A
The three quality processes on which Juran's approach to quality focused include all of the following except quality
(Multiple Choice)
4.7/5
(31)
The quality control department of a company has decided to select a sample of 10 items from the shipments received; and if the sample contains no defective parts, the entire shipment will be accepted.
a.
If four percent of the items in the shipment are defective, what is the probability that the entire shipment will be accepted?
b.
Use the binomial table and read the probability of accepting shipments that contain 5, 10, 15, 20, 25, 30, 35, 40, 45, and 50% defective units.
(Essay)
4.9/5
(37)
If the value of c in a single-stage sampling plan is increased, with n remaining constant, the probability of accepting the lot
(Multiple Choice)
4.8/5
(33)
When a Motorola executive said "That evaluation is …. perhaps the most cost-effective, value-added business consultation available anywhere in the world today" he was referring to
(Multiple Choice)
4.9/5
(39)
The second stage of a two-stage acceptance sampling plan is executed when the first-stage result is
(Multiple Choice)
4.9/5
(37)
A(n) _____ chart is used to monitor the range of measurements in the sample.
(Multiple Choice)
4.8/5
(35)
An estimator of the process standard deviation is the average _____ divided by a constant that depends on the sample size.
(Multiple Choice)
4.7/5
(34)
The Malcolm Baldrige National Quality Award was established in
(Multiple Choice)
4.8/5
(35)
In acceptance sampling, the risk of rejecting a good-quality lot is known as
(Multiple Choice)
4.9/5
(38)
Heavy emphasis on statistical analysis and careful measurement are closely associated with
(Multiple Choice)
4.8/5
(35)
In quality control terminology, the group of items being considered based on specified quality characteristics is called a
(Multiple Choice)
4.9/5
(42)
A production process is considered to be in control if it processes at least 97.5% nondefective items. Samples of size 450 are used for the inspection process. Determine the upper and lower control limits for the P chart of defective elements.
(Short Answer)
4.9/5
(36)
In contrast to Deming's philosophy, which required a major cultural change in the organization, Juran's programs were designed to improve quality by
(Multiple Choice)
4.7/5
(31)
The process mean and standard deviation can be estimated by using samples that are selected from the process when
(Multiple Choice)
4.7/5
(29)
Showing 1 - 20 of 60
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)