Exam 11: Independent Demand Ordering Systems
Exam 1: Introduction to Materials Management30 Questions
Exam 2: Production Planning System31 Questions
Exam 3: Master Scheduling25 Questions
Exam 4: Material Requirements Planning41 Questions
Exam 5: Capacity Management23 Questions
Exam 6: Production Activity Control35 Questions
Exam 7: Purchasing38 Questions
Exam 8: Forecasting27 Questions
Exam 9: Inventory Fundamentals27 Questions
Exam 10: Order Quantities25 Questions
Exam 11: Independent Demand Ordering Systems40 Questions
Exam 12: Physical Inventory and Warehouse Management31 Questions
Exam 13: Physical Distribution42 Questions
Exam 14: Products and Processes30 Questions
Exam 15: Lean Production27 Questions
Exam 16: Total Quality Management36 Questions
Select questions type
If the on hand inventory is 40 units, the safety stock 20 units and the target level is 120 units then an order should be placed for:
(Multiple Choice)
5.0/5
(37)
Lead time for a given item is 3 weeks and sales have been recorded in 1 week intervals. If the Standard Deviation for the sales interval is 25 then the Standard Deviation for the lead time should be approximately:
(Multiple Choice)
4.8/5
(39)
Select the description which most closely fits the term SAFETY STOCK:
(Multiple Choice)
4.8/5
(41)
Select the description which most closely fits the term LEAD TIME:
(Multiple Choice)
4.8/5
(30)
Which of the following statements is best?
I. In a pull system central supply determines what is needed by the distribution centers
II. In a push system all decisions are made by the distribution centers.
III. An advantage of a pull system is central coordination
(Multiple Choice)
4.9/5
(41)
Management states that they will tolerate one stockout every year for a specific item. If 10 orders are placed for the item each year the service level desired is:
(Multiple Choice)
4.9/5
(43)
Use the following information to answer the next two questions
Distribution Center A Transit time: 1week Order Quantity 200 units
Week 1 2 3 4 5 Gross Requirements 150 125 125 100 150 In Transit 200 Projected Available 75 Planned Order Release
-What will be the projected available for periods 2, 3 and 4?
(Multiple Choice)
4.9/5
(41)
Management is willing to tolerate one stockout every 2 years for a specific item. If 10 orders are placed for the item each year the service level desired is:
(Multiple Choice)
4.8/5
(36)
Which of the following are objectives of distribution inventory management?
I. To provide the required level of customer service.
II. To minimize the costs of transportation and handling.
III. To always have enough of everything on hand so there are no stockouts.
IV. To be able to interact with the factory so as to minimize scheduling problems.
(Multiple Choice)
4.8/5
(40)
Among other things the amount of safety stock carried will depend upon:
(Multiple Choice)
4.7/5
(34)
A company that keeps no safety stock can expect an average service level of
(Multiple Choice)
4.9/5
(49)
Use the following information to answer the next two questions
Distribution Center A Transit time: 1week Order Quantity 200 units
Week 1 2 3 4 5 Gross Requirements 150 125 125 100 150 In Transit 200 Projected Available 75 Planned Order Release
-There will be a planned order release(s) in weeks:
(Multiple Choice)
4.9/5
(30)
Given that the lead time is 1 week and the sigma is 100 units, if the lead time changes to 2 weeks then the sigma would change to about:
(Multiple Choice)
4.8/5
(46)
If the sum of the absolute deviations of demand was 500 for 10 periods, MAD would be:
(Multiple Choice)
4.9/5
(44)
For a given item controlled by a periodic review system the target level is 100 units. If there are 40 units on the shelf and the lead time is 2 weeks then the order quantity should be:
(Multiple Choice)
4.8/5
(38)
When using the order point system which of the following is true?
(Multiple Choice)
4.8/5
(32)