Exam 3: Managing Systems Projects

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When two or more concurrent tasks depend on a single prior task, each of the concurrent tasks is called a(n) _____.

(Multiple Choice)
4.8/5
(33)

A _____ is a proactive effort to anticipate a risk and describe an action plan to deal with it.

(Multiple Choice)
4.8/5
(31)

A _____ consists of horizontal bars, connected with arrows that indicate task dependencies.

(Multiple Choice)
4.9/5
(47)

System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.

(True/False)
4.8/5
(30)

Using a work breakdown structure (WBS) allows one to manage a project as one large task.

(True/False)
4.8/5
(34)

Matching Identify the letters of the choices that best match the phrases or definitions.​ -Defines the tasks that can start at the same time

(Multiple Choice)
4.8/5
(36)

Matching Identify the letters of the choices that best match the phrases or definitions.​ -An important value assigned to an estimate

(Multiple Choice)
4.9/5
(32)

The first step in creating a work breakdown structure (WBS) is to _____.

(Multiple Choice)
4.8/5
(35)

When several tasks can start at the same time, each is called a(n) _____ task.

(Multiple Choice)
4.8/5
(25)

Matching Identify the letters of the choices that best match the phrases or definitions.​ -Handles the administrative responsibilities for a development team

(Multiple Choice)
4.7/5
(46)

Using a(n) _____, a project manager can convert task start and finish times to actual dates by laying out the entire project on a calendar.​

(Multiple Choice)
4.8/5
(35)

_____ lists each risk and assesses the likelihood that it could affect a project.

(Multiple Choice)
4.8/5
(30)

When maintaining schedules, if enough _____ and frequent checkpoints exist, problems will be detected rapidly.

(Multiple Choice)
4.9/5
(38)

Project managers always must be aware of the _____, so they can monitor the vital tasks and keep a project on track.

(Multiple Choice)
4.9/5
(42)

Project reporting, an activity of a project manager, _____.

(Multiple Choice)
4.7/5
(26)

_____ give the project managers an opportunity to seek input and conduct brainstorming sessions.

(Multiple Choice)
4.8/5
(37)

Project scheduling, an activity of a project manager, _____.​

(Multiple Choice)
4.9/5
(35)

Matching Identify the letters of the choices that best match the phrases or definitions.​ -Tasks that must be completed one after another

(Multiple Choice)
4.8/5
(37)

_____ can involve a modeling process called what-if analysis, which allows a project manager to vary one or more element(s) in a model to measure the effect on other elements.

(Multiple Choice)
4.7/5
(39)

Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) and Gantt charts are mutually exclusive techniques.

(True/False)
4.8/5
(29)