Before this can be achieved or realized, all its predecessor activities must be completed.
(Multiple Choice)
4.8/5
(40)
If task duration estimates are carefully made, the project manager needs to only examine the critical path when conducting a risk analysis.
(True/False)
4.7/5
(35)
Why is it necessary for the project manager (PM) to be aware and to manage the slack in the project?
(Essay)
4.8/5
(33)
"Merger" is a term used to describe the situation in which two or more paths in a network join together.
(True/False)
4.8/5
(29)
A Gantt chart cannot depict a critical path, only a PERT/CPM chart can.
(True/False)
4.9/5
(32)
The amount of time a noncritical task can be delayed without delaying the project is called?
(Multiple Choice)
4.9/5
(39)
The amount of time an activity can be delayed without affecting the start time of any successor activity is known as free slack.
(True/False)
4.9/5
(40)
A situation where two or more activities have the same starting and finishing nodes or where a single activity connects to two or more nodes is called a dummy task.
(True/False)
4.8/5
(32)
All project-related statistical calculations are performed using the normal distribution.
(True/False)
4.8/5
(33)
Explain why the term critical path has less meaning in cases where the activity times are not known with certainty.
(Essay)
4.7/5
(29)
The shortest time to complete a network is equal to the duration of the longest path through the network.
(True/False)
4.9/5
(34)
Float refers to the amount of time a noncritical task can be delayed without causing a delay in the entire project.
(True/False)
4.8/5
(32)
Which type of following precedence diagramming convention is the most common?
(Multiple Choice)
4.8/5
(39)
Showing 81 - 100 of 108