Exam 9: Clearing and Rough Grading the Site

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

There are ____ seconds in a minute.

Free
(Multiple Choice)
5.0/5
(34)
Correct Answer:
Verified

A

The boundary lines of the building site are not shown on the site plan.

Free
(True/False)
5.0/5
(31)
Correct Answer:
Verified

False

Corners are usually marked with an ____ (I.P.) or some permanent feature.

Free
(Multiple Choice)
4.9/5
(25)
Correct Answer:
Verified

D

Areas that are too densely wooded to show individual trees are outlined and marked as _________.

(Multiple Choice)
4.8/5
(29)

____ refers to moving earth away from high areas and into low areas.

(Multiple Choice)
4.9/5
(33)

Trees can also be an important part of architecture - not only for their natural beauty but also for

(Multiple Choice)
4.9/5
(35)

Bearing angles are measured from north or south depending on which keeps the bearing under ____ degrees.

(Multiple Choice)
4.8/5
(43)

Trees that are to be saved are shown on the plot plan by a symbol and a note indicating their butt diameter and ____.

(Multiple Choice)
4.9/5
(44)

The grade of a site is shown by topographic ____ lines.

(Multiple Choice)
4.9/5
(41)

The first step in actual construction is to ____ the site.

(Multiple Choice)
4.8/5
(35)

Removing earth is known as a ____.

(Multiple Choice)
4.8/5
(36)

Proper grading of the site is the most effective way of controlling water vapor.

(True/False)
4.8/5
(26)

There are ____ degrees in a complete circle.

(Multiple Choice)
4.7/5
(33)

The point of beginning(POB) may or may not be shown on the site plan.

(True/False)
4.8/5
(39)

There are ____ minutes in a degree.

(Multiple Choice)
4.8/5
(32)

The elevations of specific points are given as ____ elevations.

(Multiple Choice)
4.9/5
(35)

The point of ____ (P.O.B.) may or may not be shown on the site plan.

(Multiple Choice)
4.8/5
(33)

Site grading is necessary to ensure that water drains away from the building properly and does not puddle or run into the building.

(True/False)
4.8/5
(30)

All construction activity and debris should be kept within the property boundaries unless permission is first obtained from neighboring landowners.

(True/False)
4.7/5
(42)

The vertical difference between contour lines is the vertical contour ____.

(Multiple Choice)
4.9/5
(31)
Showing 1 - 20 of 30