Exam 9: Clearing and Rough Grading the Site
Exam 1: The Design-Construction Sequence and the Design Professions30 Questions
Exam 2: Views30 Questions
Exam 3: Scales22 Questions
Exam 4: Alphabet of Lines28 Questions
Exam 5: Use of Symbols28 Questions
Exam 6: Plan Views28 Questions
Exam 7: Elevations25 Questions
Exam 8: Sections and Detail24 Questions
Exam 9: Clearing and Rough Grading the Site30 Questions
Exam 10: Locating the Building25 Questions
Exam 11: Site Utilities29 Questions
Exam 12: Footings27 Questions
Exam 13: Foundation Walls28 Questions
Exam 14: Drainage Insulation and Concrete-Slabs24 Questions
Exam 15: Framing Systems26 Questions
Exam 16: Columns, Piers, and Girders18 Questions
Exam 17: Floor Framing27 Questions
Exam 18: Laying Out Walls and Partitions21 Questions
Exam 19: Framing Openings in Walls23 Questions
Exam 20: Roof Construction Terms28 Questions
Exam 21: Roof Trusses21 Questions
Exam 22: Common Rafters27 Questions
Exam 23: Hip and Valley Framing27 Questions
Exam 24: Cornices30 Questions
Exam 25: Windows and Doors31 Questions
Exam 26: Exterior Wall Coverings27 Questions
Exam 27: Decks22 Questions
Exam 28: Finishing Site Work27 Questions
Exam 29: Fireplaces28 Questions
Exam 30: Stairs28 Questions
Exam 31: Insulation and Room Finishing28 Questions
Exam 32: Cabinets21 Questions
Exam 33: Lake House Specifications26 Questions
Exam 34: Orienting the Drawings26 Questions
Exam 35: Fire Rated and Acoustical Considerations24 Questions
Exam 36: Seismic Considerations32 Questions
Exam 37: Heavy Commercial Construction30 Questions
Exam 38: Coordination of Drawings25 Questions
Exam 39: Structural Drawings30 Questions
Exam 40: HVAC Plumbing Drawings28 Questions
Exam 41: Electrical Drawings30 Questions
Select questions type
The boundary lines of the building site are not shown on the site plan.
Free
(True/False)
5.0/5
(31)
Correct Answer:
False
Corners are usually marked with an ____ (I.P.) or some permanent feature.
Free
(Multiple Choice)
4.9/5
(25)
Correct Answer:
D
Areas that are too densely wooded to show individual trees are outlined and marked as _________.
(Multiple Choice)
4.8/5
(29)
____ refers to moving earth away from high areas and into low areas.
(Multiple Choice)
4.9/5
(33)
Trees can also be an important part of architecture - not only for their natural beauty but also for
(Multiple Choice)
4.9/5
(35)
Bearing angles are measured from north or south depending on which keeps the bearing under ____ degrees.
(Multiple Choice)
4.8/5
(43)
Trees that are to be saved are shown on the plot plan by a symbol and a note indicating their butt diameter and ____.
(Multiple Choice)
4.9/5
(44)
Proper grading of the site is the most effective way of controlling water vapor.
(True/False)
4.8/5
(26)
The point of beginning(POB) may or may not be shown on the site plan.
(True/False)
4.8/5
(39)
The elevations of specific points are given as ____ elevations.
(Multiple Choice)
4.9/5
(35)
The point of ____ (P.O.B.) may or may not be shown on the site plan.
(Multiple Choice)
4.8/5
(33)
Site grading is necessary to ensure that water drains away from the building properly and does not puddle or run into the building.
(True/False)
4.8/5
(30)
All construction activity and debris should be kept within the property boundaries unless permission is first obtained from neighboring landowners.
(True/False)
4.7/5
(42)
The vertical difference between contour lines is the vertical contour ____.
(Multiple Choice)
4.9/5
(31)
Showing 1 - 20 of 30