Exam 10: Locating the Building
Exam 1: The Design-Construction Sequence and the Design Professions30 Questions
Exam 2: Views30 Questions
Exam 3: Scales22 Questions
Exam 4: Alphabet of Lines28 Questions
Exam 5: Use of Symbols28 Questions
Exam 6: Plan Views28 Questions
Exam 7: Elevations25 Questions
Exam 8: Sections and Detail24 Questions
Exam 9: Clearing and Rough Grading the Site30 Questions
Exam 10: Locating the Building25 Questions
Exam 11: Site Utilities29 Questions
Exam 12: Footings27 Questions
Exam 13: Foundation Walls28 Questions
Exam 14: Drainage Insulation and Concrete-Slabs24 Questions
Exam 15: Framing Systems26 Questions
Exam 16: Columns, Piers, and Girders18 Questions
Exam 17: Floor Framing27 Questions
Exam 18: Laying Out Walls and Partitions21 Questions
Exam 19: Framing Openings in Walls23 Questions
Exam 20: Roof Construction Terms28 Questions
Exam 21: Roof Trusses21 Questions
Exam 22: Common Rafters27 Questions
Exam 23: Hip and Valley Framing27 Questions
Exam 24: Cornices30 Questions
Exam 25: Windows and Doors31 Questions
Exam 26: Exterior Wall Coverings27 Questions
Exam 27: Decks22 Questions
Exam 28: Finishing Site Work27 Questions
Exam 29: Fireplaces28 Questions
Exam 30: Stairs28 Questions
Exam 31: Insulation and Room Finishing28 Questions
Exam 32: Cabinets21 Questions
Exam 33: Lake House Specifications26 Questions
Exam 34: Orienting the Drawings26 Questions
Exam 35: Fire Rated and Acoustical Considerations24 Questions
Exam 36: Seismic Considerations32 Questions
Exam 37: Heavy Commercial Construction30 Questions
Exam 38: Coordination of Drawings25 Questions
Exam 39: Structural Drawings30 Questions
Exam 40: HVAC Plumbing Drawings28 Questions
Exam 41: Electrical Drawings30 Questions
Select questions type
Most buildings require some ____ (digging) to prepare the site for a foundation.
Free
(Multiple Choice)
4.9/5
(25)
Correct Answer:
C
One method of checking a right angle is the 6-8-____ method.
Free
(Multiple Choice)
4.7/5
(32)
Correct Answer:
C
The distance from the front boundary to the building line is called the front ____.
Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
C
The footings may be shown on the elevation as a double or a single ____ line.
(Multiple Choice)
4.8/5
(36)
In masonry foundations, steps in footings are usually in increments of ____ inches to conform to standard concrete block sizes.
(Multiple Choice)
4.9/5
(35)
The depth of the foundation, including its footing, is shown on the elevations.
(True/False)
4.8/5
(47)
The foundation walls are shown by two ____ lines with dimensions to indicate their sizes.
(Multiple Choice)
4.8/5
(43)
Concrete footings are placed in the top of the excavation to add to the entire weight of the building.
(True/False)
4.9/5
(34)
A laser level is ____ used to measure elevations and depths of excavations.
(Multiple Choice)
4.8/5
(31)
A ____ can be any stationary object, such as a surveyed point on a street or very large boulder.
(Multiple Choice)
4.7/5
(42)
To simplify calculating excavation depths, many architects indicate the elevations as ____ along the footings.
(Multiple Choice)
4.8/5
(32)
The building lines can be saved, even after the corner stakes are removed for earthwork by erecting batter boards.
(True/False)
4.9/5
(33)
The layout of the foundation walls and their footings is shown on the ____ plan.
(Multiple Choice)
4.9/5
(35)
When all four corners of a rectangle are ____ degrees, the diagonals are equal.
(Multiple Choice)
4.9/5
(40)
A ____ line on each side of the foundation indicates the concrete footing.
(Multiple Choice)
4.9/5
(34)
Topsoil should be stripped from the area to be excavated and stockpiled in a safe place to be used later where landscaping and lawns will be planted.
(True/False)
4.9/5
(40)
Concrete footings are placed on ____ to reduce the chance of the soil compacting under them.
(Multiple Choice)
4.8/5
(35)
In masonry foundations, steps in footings are usually in increments of ______ inches to conform to standard concrete block sizes.
(Multiple Choice)
4.7/5
(31)
The building lines are extended and marked on the batter boards.
(True/False)
4.7/5
(39)
____ boards are sturdy horizontal boards fastened between 2 * 4 stakes, at least 4 feet outside the building lines.
(Multiple Choice)
5.0/5
(38)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)