Exam 11: Site Utilities
Exam 1: The Design-Construction Sequence and the Design Professions30 Questions
Exam 2: Views30 Questions
Exam 3: Scales22 Questions
Exam 4: Alphabet of Lines28 Questions
Exam 5: Use of Symbols28 Questions
Exam 6: Plan Views28 Questions
Exam 7: Elevations25 Questions
Exam 8: Sections and Detail24 Questions
Exam 9: Clearing and Rough Grading the Site30 Questions
Exam 10: Locating the Building25 Questions
Exam 11: Site Utilities29 Questions
Exam 12: Footings27 Questions
Exam 13: Foundation Walls28 Questions
Exam 14: Drainage Insulation and Concrete-Slabs24 Questions
Exam 15: Framing Systems26 Questions
Exam 16: Columns, Piers, and Girders18 Questions
Exam 17: Floor Framing27 Questions
Exam 18: Laying Out Walls and Partitions21 Questions
Exam 19: Framing Openings in Walls23 Questions
Exam 20: Roof Construction Terms28 Questions
Exam 21: Roof Trusses21 Questions
Exam 22: Common Rafters27 Questions
Exam 23: Hip and Valley Framing27 Questions
Exam 24: Cornices30 Questions
Exam 25: Windows and Doors31 Questions
Exam 26: Exterior Wall Coverings27 Questions
Exam 27: Decks22 Questions
Exam 28: Finishing Site Work27 Questions
Exam 29: Fireplaces28 Questions
Exam 30: Stairs28 Questions
Exam 31: Insulation and Room Finishing28 Questions
Exam 32: Cabinets21 Questions
Exam 33: Lake House Specifications26 Questions
Exam 34: Orienting the Drawings26 Questions
Exam 35: Fire Rated and Acoustical Considerations24 Questions
Exam 36: Seismic Considerations32 Questions
Exam 37: Heavy Commercial Construction30 Questions
Exam 38: Coordination of Drawings25 Questions
Exam 39: Structural Drawings30 Questions
Exam 40: HVAC Plumbing Drawings28 Questions
Exam 41: Electrical Drawings30 Questions
Select questions type
Traditionally sewer pipes were cast iron and supply pipes were galvanized iron or ____.
Free
(Multiple Choice)
4.9/5
(26)
Correct Answer:
A
The septic tank holds the solid waste while it is decomposed by ____ action.
Free
(Multiple Choice)
4.9/5
(30)
Correct Answer:
A
Although electrical service is a site utility, it is not usually installed until the building is enclosed.
Free
(True/False)
4.8/5
(33)
Correct Answer:
True
The building code or health department code often requires a _________________ test before the system can be approved.
(Multiple Choice)
4.9/5
(41)
The drain field, where the leach lines are laid, is usually made of a layer of crushed stone.
(True/False)
4.9/5
(46)
The most common type of ____ system includes a septic tank and drain field.
(Multiple Choice)
4.8/5
(38)
Any plumbing that is to be concealed by concrete work must be installed without fixtures or ____ in before the concrete is placed.
(Multiple Choice)
4.8/5
(38)
The distribution box (D.B.) diverts the liquid into ____ lines.
(Multiple Choice)
4.9/5
(45)
The contractor for the new building is responsible for everything from the municipal sewer to the house.
(True/False)
4.9/5
(41)
The design of septic systems is not regulated by any health and plumbing codes.
(True/False)
4.8/5
(35)
Heavy commercial and industrial electrical services require ____.
(Multiple Choice)
4.8/5
(42)
The ____ sewer carries the waste to the municipal sewer or septic system.
(Multiple Choice)
4.9/5
(28)
Both _______ and ____________ are widely used in home construction today.
(Multiple Choice)
4.8/5
(31)
Showing 1 - 20 of 29
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)