Exam 10: Material Organization and Layout
Exam 1: Plumbers Toolbox29 Questions
Exam 2: Power Tools31 Questions
Exam 3: Types of Pipe31 Questions
Exam 4: Fittings32 Questions
Exam 5: Valves and Devices24 Questions
Exam 6: Fixtures30 Questions
Exam 7: Faucets and Drain Assemblies22 Questions
Exam 8: Plumbing Equipment and Appliances39 Questions
Exam 9: Blueprint Reading and Drafting33 Questions
Exam 10: Material Organization and Layout26 Questions
Exam 11: Water Service Installation30 Questions
Exam 12: Water Distribution Installation35 Questions
Exam 13: Drainage,waste,and Vent Segments and Sizing30 Questions
Exam 14: Drainage,waste,and Vent Installation27 Questions
Exam 15: Fixture and Equipment Installation24 Questions
Exam 16: Plumbing Repairs and Troubleshooting27 Questions
Exam 17: Hydronic Heat25 Questions
Select questions type
A _________________________ can be created to ensure all missing material is received before an installation begins and indicates to a plumber that the order is incomplete.
(Short Answer)
4.9/5
(33)
Fixture ____________________ requirements and fixture clearance codes must be known during the layout process.
(Short Answer)
4.8/5
(43)
Securing materials and ladders to a vehicle rack must be performed with proper techniques to prevent items from falling while driving.
(True/False)
4.8/5
(42)
MATCHING
Match the following terms:
-The process of receiving material through ordering or gathering material.
(Multiple Choice)
4.9/5
(41)
A plumber can be held responsible for structural failure caused by cutting,drilling,or notching a floor joist during installation.
(True/False)
4.8/5
(40)
Showing 21 - 26 of 26
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)