Exam 10: Material Organization and Layout

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A _________________________ can be created to ensure all missing material is received before an installation begins and indicates to a plumber that the order is incomplete.

(Short Answer)
4.9/5
(33)

Fixture ____________________ requirements and fixture clearance codes must be known during the layout process.

(Short Answer)
4.8/5
(43)

Securing materials and ladders to a vehicle rack must be performed with proper techniques to prevent items from falling while driving.

(True/False)
4.8/5
(42)

MATCHING Match the following terms: -The process of receiving material through ordering or gathering material.

(Multiple Choice)
4.9/5
(41)

List five methods for organizing plumbing materials.

(Essay)
4.8/5
(39)

A plumber can be held responsible for structural failure caused by cutting,drilling,or notching a floor joist during installation.

(True/False)
4.8/5
(40)
Showing 21 - 26 of 26
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)