What are the three flow positions of a drainage system?

(Essay)
4.8/5
(33)

Most codes dictate that the stack vent cannot transition horizontally until it is 8" above the flood level rim of the highest fixture connecting to the waste stack.

(True/False)
4.9/5
(40)

MATCHING Match the following terms: -Vent serving two fixture drains located on the same floor and either connecting at the same height or at different heights to the drain.

(Multiple Choice)
4.7/5
(35)

Layout for a DWV system is typically the first process completed on a project,and other piping systems are installed around the DWV system.

(True/False)
4.9/5
(42)

Cleanouts are required based on changes in direction,distance,and at the base of a waste stack.

(True/False)
4.7/5
(41)

The _______________ is the main vertical drain pipe that begins with its connection to the building drain and terminates with its connection to the stack vent.

(Short Answer)
4.9/5
(32)

Most codes allow a 2" fixture drain to be served by a 1-1/2" removable slip joint.

(True/False)
4.7/5
(32)

Many codes state a building drain must extend at least __________ and a maximum of __________ from the exterior of the building.

(Short Answer)
4.7/5
(33)

MATCHING Match the following terms: -Vertical pipe that connects to a soil or waste stack and extends to open air or connects with another approved vent;can be installed with horizontal offsets.

(Multiple Choice)
4.9/5
(34)

MATCHING Match the following terms: -Wastewater that has been separated from solids,but may contain dissolved sewage solids.

(Multiple Choice)
4.8/5
(31)