Exam 10: Digital System Projects Using HDL

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A problem statement is developed because a need exists. The statement should:

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

B

City planners know that 20,000 square feet of government office space must be built on the west edge of the city within the next two years. This kind of project development qualifies as:

Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
Verified

B

The worst mistake a project manager could make is to assume that existing technologies will easily combine and work together.

Free
(True/False)
4.8/5
(34)
Correct Answer:
Verified

True

A 4- bit ring counter that requires only four possible output combinations would disregard eleven combinations. What effect would the clock frequency have on the output?

(Multiple Choice)
4.9/5
(42)

The first step in structured project development is:

(Multiple Choice)
4.8/5
(30)

Which of the following is one of the reasons a digital clock project is a valuable learning tool for project development?

(Multiple Choice)
4.8/5
(39)

In a real project the first step of definition often involves some _____on the part of the project manager.

(Short Answer)
4.7/5
(29)

The third step in any project is_____and_____ .

(Short Answer)
4.8/5
(34)

From a 60 Hz line voltage, a MOD 60 counter will output 1 pulse per second on 1 Hz.

(True/False)
4.7/5
(43)

A frequency_____is a circuit that can measure and display the frequency of a signal.

(Short Answer)
4.7/5
(44)

A crystal controlled clock generator and Schmitt- trigger would make an excellent clock source.

(True/False)
4.8/5
(34)

Stepper motors can be operated sequentially through specific binary sequence or by straight DC voltage.

(True/False)
4.8/5
(37)

Top- down hierarchical design considers every project detail first.

(True/False)
4.8/5
(44)

State diagrams are useful for:

(Multiple Choice)
4.9/5
(38)

Schmitt- trigger integrated circuits:

(Multiple Choice)
4.8/5
(35)

Stepper motor drives will provide output through the Q output only.

(True/False)
4.7/5
(45)

After the dark box is defined:

(Multiple Choice)
4.8/5
(30)

After repeated simulated testing, a stepper motor drive was considered fully functional in every aspect. At this point:

(Multiple Choice)
4.8/5
(38)

During the strategic planning mode, it has become apparent that a required subsystem does not fit the planned application as assumed. Planners have made the decision to use a completely different technology to achieve the same end. In keeping with structured project development:

(Multiple Choice)
4.8/5
(27)

The tens of hours section of a digital clock will require a_____ counter.

(Short Answer)
4.8/5
(41)
Showing 1 - 20 of 77