Exam 10: Digital System Projects Using HDL

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

Dark box design is similar to thevenizing an unknown analog output voltage. The black box represents:

(Multiple Choice)
4.8/5
(38)

The first step in any project is the thorough _____of its scope.

(Short Answer)
4.7/5
(38)

A digital clock model decodes a 1 pulse per second input into seconds, minutes and hours; sixty seconds advance minutes, and sixty minutes advance hours. How do hours recycle back to one after 12?

(Multiple Choice)
4.7/5
(42)

A 1 pulse per second signal is used as asynchronous clock for all of the counter states,which are _______ cascaded.

(Short Answer)
4.9/5
(43)

The second step in project management is synthesis and testing.

(True/False)
5.0/5
(40)

A _____counter is also called a MOD 10 counter.

(Short Answer)
4.7/5
(35)

All the components of small project management work together:

(Multiple Choice)
4.9/5
(38)

From 60 Hz wave input, what is required for reliable clock signal?

(Multiple Choice)
4.8/5
(32)

The last step in the small project development process is:

(Multiple Choice)
4.9/5
(40)

In the microwave oven project, each block has an output called TC. It is used to indicate that a counter has reached zero.

(True/False)
4.9/5
(40)

A frequency counter will overflow if:

(Multiple Choice)
4.9/5
(39)

_____hierarchical design means that we want to start at the highest level of hierarchy.

(Short Answer)
4.9/5
(42)

One example of definition includes who will buy this product.

(True/False)
4.9/5
(41)

A frequency counter is an assembly of basic digital building blocks. No new technology exists.

(True/False)
4.7/5
(42)

The second step in any project is coming up with a _____.

(Short Answer)
4.9/5
(36)

Stepper motors operate in full steps, half steps, and modified half step sequences like the wave drive sequence shown in table 10- 1. The wave drive sequence:

(Multiple Choice)
4.8/5
(46)

Using one construct inside of another is known as_____.

(Short Answer)
4.9/5
(35)

The steps of project management, in order, are: definition, planning, testing, and system integration.

(True/False)
4.7/5
(39)

Digital clocks are a combination of MOD 60, MOD 6, MOD 10, and MOD 2 counters.

(True/False)
4.9/5
(47)

The shorter time a waveform is sampled, the less _____ it will be measured at.

(Short Answer)
4.8/5
(40)
Showing 21 - 40 of 77
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)