A MOD 10 counter could not be built from a MOD 12 counter.

(True/False)
4.8/5
(32)

The last step in project management includes system_____and ______.

(Short Answer)
4.8/5
(39)

Applying project management principles will reduce the_____factor.

(Short Answer)
4.9/5
(36)

The magnetron control block in the microwave oven project must make sure that the magnetron remains turned on after the start button has been released. This is accomplished by using an _____.

(Short Answer)
4.9/5
(36)

When the building blocks of a project have been defined, created and individually simulated to verify that they work correctly:

(Multiple Choice)
4.8/5
(45)

The amplitude of a frequency being measured:

(Multiple Choice)
4.9/5
(45)

Small project development should be managed with deliberation that is equal to that of large project development. The only issue large and small projects don't have in common is:

(Multiple Choice)
4.8/5
(43)

Every aspect of project development must be thoroughly tested through simulation and by actual implementation.

(True/False)
4.8/5
(40)

Digital clocks are really modified, cascaded, asynchronous counters.

(True/False)
4.8/5
(41)

At the point where all possible inputs and outputs of a digital project are known:

(Multiple Choice)
4.9/5
(36)

A Schmitt- trigger is a pulse shaper.

(True/False)
4.9/5
(38)

An active low ring counter sequences a zero through each flip- flop.

(True/False)
5.0/5
(32)

The first step in any project is the thorough definition of its scope.

(True/False)
4.8/5
(38)

The clean feature in the microwave oven counter block is_____ and active _____.

(Short Answer)
4.7/5
(32)

Invalid states in a state transition diagram indicate states that will be sequenced but will be all zeros or all ones.

(True/False)
4.9/5
(48)

A short sampling interval will:

(Multiple Choice)
4.9/5
(39)

Project conception may be top- down hierarchy but:

(Multiple Choice)
4.9/5
(46)

The outputs enable function:

(Multiple Choice)
4.8/5
(37)

Regarding the frequency counter project, which statement best represents the black box?

(Multiple Choice)
4.8/5
(41)

The job of a prescalar is to divide the 60 Hz incoming signal down to 1 Hz.

(True/False)
4.8/5
(51)