Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
A cash flow analysis utilizes information from a (an)????
Free
(Multiple Choice)
4.9/5
(46)
Correct Answer:
D
Match the type of schedule listed with the description following. Schedule types may be used more than once.
-Utilizes notation
Free
(Multiple Choice)
4.8/5
(44)
Correct Answer:
A
The ????type of schedule is graphically simple, easily understood, and accepted by the construction industry.
(Multiple Choice)
4.9/5
(44)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Describe owner's objectives
(Multiple Choice)
4.9/5
(34)
The architect is most heavily involved during which of the following project phases?
(Multiple Choice)
4.9/5
(42)
In a Design/Bid/Build contractual arrangement, the architect signs a contract with the????
(Multiple Choice)
4.8/5
(36)
In what project phase are the bid packages advertised and the project contracted out so construction can begin?
(Multiple Choice)
4.8/5
(34)
What is (are) the benefits of meeting with local contractors prior to developing a project bid package?
(Multiple Choice)
4.8/5
(30)
Which of the estimates listed would occur last in a project time line?
(Multiple Choice)
4.8/5
(36)
In a guaranteed maximum price contract, costs above the guarantee are absorbed by the owner.
(True/False)
4.9/5
(41)
In CPM the steps or operations necessary to complete a project are shown on a bar chart.
(True/False)
4.9/5
(43)
General conditions and home office overhead are examples of what type of costs?
(Multiple Choice)
4.7/5
(38)
A (An)????is a systematic classification and categorization of all work or cost items pertaining to a particular project.
(Multiple Choice)
4.9/5
(47)
Fast tracking is one of the major advantages in a traditional arrangement.
(True/False)
4.8/5
(44)
Match the type of schedule listed with the description following. Schedule types may be used more than once.
-Graphic style makes it adaptable to high-rise construction
(Multiple Choice)
4.9/5
(41)
Match the description with the terms listed.Terms may be used only once.
-Unofficial tracking of clarifications
(Multiple Choice)
4.8/5
(33)