Exam 15: Key Concepts in Construction Management and Delivery Methods

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A cash flow analysis utilizes information from a (an)????

Free
(Multiple Choice)
4.9/5
(46)
Correct Answer:
Verified

D

Match the type of schedule listed with the description following. Schedule types may be used more than once. -Utilizes iji-j notation

Free
(Multiple Choice)
4.8/5
(44)
Correct Answer:
Verified

A

What is a punch list?

Free
(Multiple Choice)
4.7/5
(41)
Correct Answer:
Verified

C

Value engineering can best be described as ????

(Multiple Choice)
4.9/5
(29)

The ????type of schedule is graphically simple, easily understood, and accepted by the construction industry.

(Multiple Choice)
4.9/5
(44)

Identify in which listed project phase each following project activity would normally occur. Use each phase once only. -Describe owner's objectives

(Multiple Choice)
4.9/5
(34)

The architect is most heavily involved during which of the following project phases?

(Multiple Choice)
4.9/5
(42)

In a Design/Bid/Build contractual arrangement, the architect signs a contract with the????

(Multiple Choice)
4.8/5
(36)

In what project phase are the bid packages advertised and the project contracted out so construction can begin?

(Multiple Choice)
4.8/5
(34)

What is (are) the benefits of meeting with local contractors prior to developing a project bid package?

(Multiple Choice)
4.8/5
(30)

Which of the estimates listed would occur last in a project time line?

(Multiple Choice)
4.8/5
(36)

In a guaranteed maximum price contract, costs above the guarantee are absorbed by the owner.

(True/False)
4.9/5
(41)

In reporting, a variance can best be described as????

(Multiple Choice)
4.7/5
(29)

Owner involvement is highest during what project phase?

(Multiple Choice)
4.9/5
(43)

In CPM the steps or operations necessary to complete a project are shown on a bar chart.

(True/False)
4.9/5
(43)

General conditions and home office overhead are examples of what type of costs?

(Multiple Choice)
4.7/5
(38)

A (An)????is a systematic classification and categorization of all work or cost items pertaining to a particular project.

(Multiple Choice)
4.9/5
(47)

Fast tracking is one of the major advantages in a traditional arrangement.

(True/False)
4.8/5
(44)

Match the type of schedule listed with the description following. Schedule types may be used more than once. -Graphic style makes it adaptable to high-rise construction

(Multiple Choice)
4.9/5
(41)

Match the description with the terms listed.Terms may be used only once. -Unofficial tracking of clarifications

(Multiple Choice)
4.8/5
(33)