Exam 19: Systems Construction and Implementation
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
The person generally responsible for network security is called a(n):
Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
A, C
Which kind of validation testing makes sure the system is easy to use?
Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
B
The ____________________________ phase involves the development, installation and testing of system components.
Free
(Short Answer)
4.8/5
(36)
Correct Answer:
Systems construction
A(n) _____________________________________ is a final system test performed by end-users using real data over an extended time period. It is an extensive test that addresses three levels of testing: verification testing; validation testing and audit testing.
(Short Answer)
4.8/5
(38)
The purpose of systems implementation is to construct and deliver into production a working information system.
(True/False)
4.9/5
(39)
During the activity of building and testing networks, system users are involved extensively.
(True/False)
4.8/5
(40)
_____________________________ is the situation that is a variation on the abrupt and parallel conversions. It is based on the version concept. Each successive version of the new system is converted as it is developed.
(Short Answer)
4.9/5
(40)
____________________________ runs the system in a simulated environment using simulated data. It is sometimes called alpha testing.
(Short Answer)
4.8/5
(43)
__________________________ certifies that the system is free of errors and is ready to be placed into operation.
(Short Answer)
4.8/5
(30)
Preparing a conversion plan is done during the systems _______________ phase.
(Short Answer)
4.8/5
(37)
The principal deliverable of the install and test new software activity is the installed and tested software packages and the documentation being placed in the library.
(True/False)
4.8/5
(40)
Which kind of validation testing might lead to rescheduling some processing to other parts of the day?
(Multiple Choice)
4.9/5
(30)
Which kind of testing runs the system in a live environment using real data?
(Multiple Choice)
4.8/5
(42)
The first activity of the construction phase is to install new software packages.
(True/False)
4.8/5
(29)
If a programmer wrote a subroutine to calculate shipping cost, it would initially be tested with a(n):
(Multiple Choice)
4.9/5
(44)
Which of the following is NOT a task of the Systems Construction phase?
(Multiple Choice)
4.9/5
(38)
The term unpopulated means that database _____________________ is implemented but ______ has not been loaded.
(Short Answer)
4.8/5
(45)
The task of building and testing databases is often done at the same time as programming.
(True/False)
4.9/5
(35)
Which kind of testing runs the system in a simulated environment using simulated data?
(Multiple Choice)
4.9/5
(35)
Showing 1 - 20 of 60
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)