Exam 19: Systems Construction and Implementation

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

The person generally responsible for network security is called a(n):

Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
Verified

A, C

Which kind of validation testing makes sure the system is easy to use?

Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
Verified

B

The ____________________________ phase involves the development, installation and testing of system components.

Free
(Short Answer)
4.8/5
(36)
Correct Answer:
Verified

Systems construction

A(n) _____________________________________ is a final system test performed by end-users using real data over an extended time period. It is an extensive test that addresses three levels of testing: verification testing; validation testing and audit testing.

(Short Answer)
4.8/5
(38)

The purpose of systems implementation is to construct and deliver into production a working information system.

(True/False)
4.9/5
(39)

During the activity of building and testing networks, system users are involved extensively.

(True/False)
4.8/5
(40)

_____________________________ is the situation that is a variation on the abrupt and parallel conversions. It is based on the version concept. Each successive version of the new system is converted as it is developed.

(Short Answer)
4.9/5
(40)

____________________________ runs the system in a simulated environment using simulated data. It is sometimes called alpha testing.

(Short Answer)
4.8/5
(43)

__________________________ certifies that the system is free of errors and is ready to be placed into operation.

(Short Answer)
4.8/5
(30)

Preparing a conversion plan is done during the systems _______________ phase.

(Short Answer)
4.8/5
(37)

A stub test is a test performed on a subset of a program.

(True/False)
4.9/5
(36)

The principal deliverable of the install and test new software activity is the installed and tested software packages and the documentation being placed in the library.

(True/False)
4.8/5
(40)

Which kind of validation testing might lead to rescheduling some processing to other parts of the day?

(Multiple Choice)
4.9/5
(30)

Which kind of testing runs the system in a live environment using real data?

(Multiple Choice)
4.8/5
(42)

The first activity of the construction phase is to install new software packages.

(True/False)
4.8/5
(29)

If a programmer wrote a subroutine to calculate shipping cost, it would initially be tested with a(n):

(Multiple Choice)
4.9/5
(44)

Which of the following is NOT a task of the Systems Construction phase?

(Multiple Choice)
4.9/5
(38)

The term unpopulated means that database _____________________ is implemented but ______ has not been loaded.

(Short Answer)
4.8/5
(45)

The task of building and testing databases is often done at the same time as programming.

(True/False)
4.9/5
(35)

Which kind of testing runs the system in a simulated environment using simulated data?

(Multiple Choice)
4.9/5
(35)
Showing 1 - 20 of 60
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)